PRICE GUIDE · ELECTRICAL

Three-Phase Installation cost in the UK
£1,200–£6,000 per job. Typically £1,500.

Upgrading a UK home to three-phase power costs £1,200–£6,000, with about £1,500 typical where a three-phase cable already runs in the street. The network operator's work is the big unknown — a long new cable or network reinforcement costs far more — plus a three-phase consumer unit inside.

  • Search and compare — no account needed
  • Nearest to you first
  • One score from Google, Trustpilot and Locufy reviews

HOW MUCH IT COSTS

How much does three-phase installation cost in the UK?

THREE-PHASE INSTALLATION PRICE · PER JOB · THE UK
Low end£1,200a simple upgrade with three-phase cable nearby
Typical£1,500what most people pay
High end£6,000a long new cable or network reinforcement
Typical £1,500
£1,200 low£6,000 high

Locufy guide prices for 2026–2027. Updated 2026. A national range, not a quote — enter your town above for real prices from the electricians and electrical firms near you.

What moves the price

  • Network operator works — the distribution network operator decides and charges for the new supply
  • Distance to three-phase cable — a cable already in the street is far cheaper than a new run
  • Network reinforcement — a local substation or cable upgrade can push costs up sharply
  • Consumer unit — a three-phase board and new wiring inside the house add to the cost
  • What it powers — 22kW EV chargers, large heat pumps and workshops drive the need
  • Meter change — a three-phase meter is fitted by your supplier, which can add time to the job
+6%PRICE TREND · 5 YEARS

Electrical work prices in the UK are up 6% over five years (ONS Consumer Price Inflation, Services for maintenance and repair, to 2026 August). Five years ago a typical three-phase installation would have cost about £1420 — an estimate from today's guide price and that index, not a recorded price. Source: ONS MM23 D7DO →

WHAT YOU GET

What a three-phase installation booking includes

Load assessmentThe electrician works out what supply you need and why.
Network applicationAn application made to the network operator for a three-phase connection.
Three-phase consumer unitA new board fitted to split loads across the three phases.
Connection and certificateCircuits connected, tested and certified after the network work.

Takes: A day for the electrician's work, with network operator works scheduled separately and often weeks away. Not included: The network operator's own connection charges are often quoted separately, along with groundworks and the EV charger or heat pump itself — see the related guides below.

WHAT PEOPLE BOOK

Common three-phase installation jobs

22kW EV chargingA three-phase supply for fast EV charging at a house in Wetherby.
Large heat pumpThree-phase power for a large heat pump at a farmhouse near Linlithgow.
Home workshopThree-phase power for workshop machinery at a property near Otley.
Supply already in streetA simple upgrade where three-phase cable ran past a house in Solihull.
Rural reinforcementA longer cable run needed for a rural home near Clevedon.
New-build homeA three-phase supply specified for a self-build near Musselburgh.

KNOW THE PRICE? NOW SEE THE REAL ONES

Three-Phase Installation near you, with prices shown

The electricians and electrical firms that cover your area, nearest first, each with their price and one score from every review. No account needed to look.

Or post the job free and let them come to you.

How to pay less

  • Ask for the new three-phase meter position close to the street cable, as a shorter run keeps the network operator's charge down
  • Check whether a larger single-phase supply would meet your needs instead
  • Combine the three-phase installation with an EV charger or heat pump install to share labour

Before you book

  • Only the network operator can upgrade the supply to three-phase — an electrician cannot arrange it alone
  • Ask your electrician to confirm the loads really need three-phase before applying
  • Network operator works can take weeks or months, so plan the three-phase timing early
  • New three-phase circuits should be certified by a registered electrician

Three-Phase Installation cost: questions people ask

£1,200–£6,000 per job, about £1,500 typical where three-phase cable is already nearby. A long new cable or network reinforcement costs the most.

The electrician's work takes about a day, but network operator works are often scheduled weeks or months ahead.

Only for 22kW charging. Most homes charge happily at 7kW on a single-phase supply.

You or your electrician apply to the local network operator, which designs and carries out the connection and charges for it.

Network operator charges are often separate, along with groundworks and the equipment needing the supply.

They are Locufy guide prices for the UK, read from published UK three-phase supply costs — a national range, not a quote. The network work decides most of your price.