PRICE GUIDE · ELECTRICAL

Consumer Unit / Fuse Board Upgrade cost in the UK
£350–£750 per unit. Typically £525.

Replacing a fuse board with a modern consumer unit costs £350–£750 in the UK, about £525 typical. Most homes need around ten circuits; more circuits, RCBO protection on each one, surge protection and faults found during testing push the price up.

  • Search and compare — no account needed
  • Nearest to you first
  • One score from Google, Trustpilot and Locufy reviews

HOW MUCH IT COSTS

How much does a consumer unit / fuse board upgrade cost in the UK?

CONSUMER UNIT / FUSE BOARD UPGRADE PRICE · PER UNIT · THE UK
Low end£350a small board with few circuits
Typical£525what most people pay
High end£750a larger RCBO board with faults to fix
Typical £525
£350 low£750 high

Locufy guide prices for 2026–2027. Updated 2026. A national range, not a quote — enter your town above for real prices from the electricians and electrical firms near you.

What moves the price

  • Number of circuits — a larger home with more circuits needs a bigger consumer unit
  • RCD or RCBO protection — individual RCBOs on each circuit cost more than shared RCDs
  • Surge protection — a surge protection device is now commonly fitted with a new board
  • Faults found — earthing or wiring faults uncovered during testing are fixed before sign-off of the consumer unit, adding cost
  • Bonding — missing earth bonding to gas and water pipes adds work
  • Location — moving the consumer unit to a new position adds cable and time
+6%PRICE TREND · 5 YEARS

Electrical work prices in the UK are up 6% over five years (ONS Consumer Price Inflation, Services for maintenance and repair, to 2026 August). Five years ago a typical consumer unit / fuse board upgrade would have cost about £660 — an estimate from today's guide price and that index, not a recorded price. Source: ONS MM23 D7DO →

WHAT YOU GET

What a consumer unit / fuse board upgrade booking includes

Pre-installation testsExisting circuits tested to find faults before the old board comes off.
New consumer unitA metal-clad consumer unit fitted with breakers and RCD protection.
Reconnecting circuitsEach circuit reconnected, labelled and checked.
CertificateThe work tested and certified, and notified to building control under Part P.

Takes: Four to eight hours, with the power off for most of the day. Not included: Repairs to faulty circuits, a full rewire and moving the electricity meter are usually priced separately — see the related guides below.

WHAT PEOPLE BOOK

Common consumer unit jobs

Old fuse box replacedA wired-fuse box replaced with a consumer unit in a terrace in Morley.
Plastic board upgradeA plastic consumer unit replaced with a metal one in a semi in Sale.
RCBO boardA board with individual RCBOs fitted in a house in Clifton.
Board for an EV chargerA larger consumer unit fitted to add an EV circuit in a home in Solihull.
Tripping RCD fixedA board upgraded after nuisance tripping in a flat in Glasgow.
Rental complianceA consumer unit replaced after an EICR in a let in Salford.

KNOW THE PRICE? NOW SEE THE REAL ONES

Consumer Unit / Fuse Board Upgrade near you, with prices shown

The electricians and electrical firms that cover your area, nearest first, each with their price and one score from every review. No account needed to look.

Or post the job free and let them come to you.

How to pay less

  • Combine the consumer unit upgrade with an EICR or other electrical work in one visit
  • Ask for a spare way or two so future circuits do not need another consumer unit
  • Clear a path to the consumer unit and meter before the electrician arrives, so paid time goes on the upgrade itself

Before you book

  • Consumer unit replacement is notifiable under Part P, so use a registered electrician such as NICEIC or NAPIT
  • Ask what happens if faults are found in the existing wiring during testing
  • Landlords need the electrics inspected regularly, and that inspection often prompts a fuse board upgrade
  • Check you will receive an Electrical Installation Certificate and building control notification for the new consumer unit

Consumer Unit / Fuse Board Upgrade cost: questions people ask

£350–£750 per unit, about £525 typical. A small board with few circuits costs least; a larger RCBO board with faults to fix costs the most.

Four to eight hours, so expect the power to be off for most of the day.

Not always by law, but old boards lack RCD protection against electric shock. An EICR shows whether yours should be replaced.

Yes. It is notifiable work under Part P, and the electrician must issue a certificate and notify building control.

Repairs to faulty circuits, a rewire and moving the meter are separate. Ask whether surge protection is included.

They are Locufy guide prices for the UK, read from published UK consumer unit replacement costs — a national range, not a quote. Circuits and faults decide your price.