Three-phase has two halves: the network operator's supply and the electrician's notifiable work inside. The checks, the questions and the paperwork.
- Search and compare — no account needed
- Nearest to you first
- One score from Google, Trustpilot and Locufy reviews
THE 60-SECOND VERSION
Hiring a three-phase electrician in five steps
- Confirm you need itA 22kW charger, a large heat pump or workshop machines — the electrician should check the loads first.
- Look them up firstThe Registered Competent Person Electrical register covers England and Wales; check the name there before agreeing the three-phase upgrade.
- Separate the two jobsNetwork operator's supply and the electrician's work inside, priced apart.
- Plan the timingNetwork work can take weeks; book the electrician around it.
- Get both certificatesElectrical Installation Certificate on the day; compliance certificate from the scheme.
BEFORE YOU BOOK
Check before you book
Registered Competent Person Electrical
In England and Wales, the three-phase upgrade replaces the consumer unit and adds circuits, which is notifiable work. That leaves two routes for the three-phase upgrade: an electrician registered with an authorised competent person scheme such as NICEIC or NAPIT certifies it under the Building Regulations, or building control is told in advance and charges you to inspect.
Type the business name into the register's search before the three-phase upgrade is booked. electricalcompetentperson.co.uk →
Electrical Installation Certificate
The three-phase consumer unit and circuits are tested to BS 7671 and recorded on an Electrical Installation Certificate. Because the three-phase upgrade is notifiable, the scheme also issues a Building Regulations compliance certificate: gov.uk says within 8 weeks in England, and the Welsh Government says the electrician should arrange it within 30 days.
The certificate for the three-phase upgrade, readings included, should be handed over on completion — ask for it then. gov.wales →
Building warrant (Scotland) and Northern Ireland
Scotland has no competent person register for electricians: the three-phase upgrade must meet building standard 4.5, which means wiring to BS 7671, and some work, such as rewiring a flat, needs a building warrant that the owner applies for. Northern Ireland has no Part P-style notification rule for home wiring, which covers the three-phase upgrade too.
For a Scottish home, ask the electrician whether the three-phase upgrade needs a building warrant and whether they are an approved certifier of construction. gov.scot →
Insurance and trader status
Expect public liability cover for the three-phase upgrade, and ask for the insurer's name and the limit. Because you are buying from a trader, the Consumer Rights Act 2015 applies to the three-phase upgrade; agreed in your home or at a distance, it usually carries a 14-day cancellation right under the Consumer Contracts Regulations 2013, although work you asked to begin early is paid for and made-to-measure goods are excluded (regulation 28).
Ask for the insurance certificate before the three-phase upgrade is booked, and look for the trader and ID-checked badges on the Locufy profile.
VAT
The electrical work for a three-phase supply is standard-rated, so VAT is 20%; a firm with taxable turnover over £90,000 must be VAT-registered, charge that 20% and show it as a separate line on the quote and invoice.
Ask for the VAT number, and look for VAT as its own line on the electrician's three-phase quote. gov.uk →
A good answer: A calculation of what you plan to run, and an honest view if a larger single-phase supply would do.
A good answer: A clear split: the supply to the meter is theirs, the consumer unit and circuits inside are the electrician's.
A good answer: Agreed in advance — you or the electrician — with the application details ready.
A good answer: Make and type named, with the circuits it will feed.
A good answer: A plan to spread circuits across the three phases.
A good answer: An Electrical Installation Certificate and a compliance certificate from the scheme.
Getting the quote right
- The electrician's work inside: consumer unit, circuits, testing
- The network operator's charge shown separately, or marked as not included
- Meter change and who arranges it
- Any new circuits for chargers, heat pumps or machines
- Who actually attends — the electrician doing the work inside the house, employed or subcontracted — and the business's VAT number, with VAT at 20% shown as its own line
- Certification included
Walk away if
- Says the electrician alone can upgrade the supply
- A single price that hides the network operator's charge
- No load calculation before recommending three-phase
- No scheme registration in England or Wales
- No certificate for the new consumer unit
What a three-phase electrician costs: £1,200–£6,000 per job
A three-phase upgrade is priced per job; the network operator's charge for the new supply is the biggest variable, with the consumer unit and circuits inside priced by the electrician. Three-Phase Installation price guide →
Guide prices compiled by the Locufy team from published Irish and UK provider price lists and 2026/27 cost guides. Updated 2026.
KNOW WHAT TO LOOK FOR? NOW FIND ONE
Three-phase electricians near you, with the badges that matter shown
ID checked, trader status and one score from every review — on the card, before you message anyone. Nearest first. No account needed to look.
Or post the job free and let them come to you.
- Assess the loadThe electrician checks what you plan to run and confirms three-phase is needed.
- Network applicationThe network operator surveys and quotes the new supply.
- Supply and meterThe operator brings the supply; the meter is changed.
- Inside installationThree-phase consumer unit and circuits installed and tested.
- CertifyElectrical Installation Certificate handed over and the work notified through the scheme.
- Three-phase
- A supply with three live conductors, for higher loads.
- Single-phase
- The usual home supply with one live conductor.
- Network operator
- The company that owns the local cables and brings the supply.
- Phase balancing
- Spreading loads across the three phases.
- Three-phase consumer unit
- A board designed to distribute a three-phase supply.
- Compliance certificate
- The scheme's confirmation that notifiable work meets the Building Regulations.
AFTER
When the job is done
Hiring a three-phase electrician: questions people ask
The work inside the home — a new consumer unit and circuits — is notifiable in England and Wales: a scheme electrician self-certifies it, or building control is notified first.
An Electrical Installation Certificate for the new installation, and a compliance certificate from the scheme.
£1,200–£6,000 a job, typically around £1,500. The network operator's work is the big unknown; the consumer unit and circuits inside add to it. See the Three-Phase Installation price guide for the detail, then search your postcode above to compare three-phase electricians nearby.
They can help with the application, but the supply itself is the network operator's work.
The inside work is days; the network side can take weeks, so plan the timing early.
Only for the faster chargers that need it; most home chargers run on single-phase.
MORE GUIDES
More hiring guides in electrical
Three-phase electricians near you
Sources — checked October 2026
- gov.uk — Approved Document P: electrical safety in dwellings (England)
- Registered Competent Person Electrical register
- gov.uk — building work, replacements and repairs to your home (England)
- gov.wales — building regulations: electrics
- gov.scot — Building Standards Technical Handbook 2022 (domestic), standard 4.5 electrical safety
- gov.uk — building regulations: use a competent person scheme
- Consumer Rights Act 2015, section 49 — reasonable care and skill
- Consumer Rights Act 2015, section 54 — what you can ask for when a service falls short
- Consumer Contracts Regulations 2013, regulation 30 — the 14-day cancellation period
- Consumer Contracts Regulations 2013, regulation 28 — contracts the cancellation right does not cover
- Consumer Contracts Regulations 2013, regulation 36 — services started within the cancellation period
- Civil Procedure Rules Part 26 — the small claims track limit (England and Wales)
- Scottish Courts and Tribunals — making a claim under simple procedure
- nidirect — the small claims process (Northern Ireland)
- Buildings and construction (VAT Notice 708) — 2.1 Construction services: work to an existing building is normally standard-rated
- GOV.UK — VAT rates
- GOV.UK — Register for VAT: when to register