HOW TO HIRE · ELECTRICAL · CHECKED OCTOBER 2026
How to hire a partial rewiring electrician in the UK
The checks, the questions and the paperwork.
Replacing circuits is notifiable in England and Wales. The register check, testing what stays, and the certificates you should receive.
- Search and compare — no account needed
- Nearest to you first
- One score from Google, Trustpilot and Locufy reviews
THE 60-SECOND VERSION
Hiring a partial rewiring electrician in five steps
- Find out which circuits need itAn EICR or a test of the existing wiring tells you which circuits to replace — and which can stay.
- Look them up firstThe Registered Competent Person Electrical register covers England and Wales; check the name there before agreeing the partial rewire.
- Ask about the consumer unitAn old board may not protect new circuits properly; get the answer before the quote.
- Compare written specificationsCircuits, points and making good listed, so the quotes match.
- Get the certificate and the compliance certificateOne from the electrician on the day, one from the scheme afterwards.
BEFORE YOU BOOK
Check before you book
Registered Competent Person Electrical
In England and Wales, the partial rewire installs new circuits, which is notifiable work; so is a replacement consumer unit and anything near a bath or shower, and in Wales anything in a kitchen. So the partial rewire is either self-certified under the Building Regulations by an electrician on a government-authorised competent person scheme, such as NICEIC or NAPIT, or notified to building control before it starts, and you pay for that inspection.
Type the business name into the register's search before the partial rewire is booked. electricalcompetentperson.co.uk →
Electrical Installation Certificate
The new circuits in the partial rewire are tested to BS 7671 and recorded on an Electrical Installation Certificate. Because the partial rewire is notifiable, the scheme also issues a Building Regulations compliance certificate: gov.uk says within 8 weeks in England, and the Welsh Government says the electrician should arrange it within 30 days.
Before you pay for the partial rewire, ask for the certificate with its test results. gov.wales →
Building warrant (Scotland) and Northern Ireland
In Scotland there is no competent person register: the partial rewire must meet building standard 4.5 (BS 7671), and the 2019 Scottish Government research lists rewiring as needing a building warrant in flats and buildings over three storeys. In Northern Ireland, the partial rewire comes under building regulations with no Part P-style notification scheme for home wiring.
In Scotland, ask whether the partial rewire needs a warrant and whether the electrician is an approved certifier of construction. gov.scot →
Insurance and trader status
Before the partial rewire, confirm the public liability insurance and its limit. You have Consumer Rights Act 2015 protection because the provider is a trader; and if the partial rewire is agreed in your home or online, the Consumer Contracts Regulations 2013 usually let you cancel within 14 days, except for made-to-measure goods and the part of the work you asked them to start early.
Before booking the partial rewire, ask to see current insurance and check the Locufy profile for its trader and ID badges.
VAT
VAT on a partial rewire is charged at the standard 20%, and any business turning over more than £90,000 a year in taxable sales has to register, add it to the price and set it out on its own line.
Ask for the VAT number, and look for VAT as its own line on the partial rewire quote. gov.uk →
A good answer: A list based on testing: the kitchen ring because it fails insulation tests, not 'everything looks old'.
A good answer: Yes — a partial rewire should not leave you with a new kitchen on old, faulty wiring elsewhere. Faults found are reported and priced separately.
A good answer: A reasoned answer. New circuits need proper RCD protection; an old board without it may have to go.
A good answer: The electrician, through a named competent person scheme, with an Electrical Installation Certificate on the day.
A good answer: A clear line: chases filled, or fully replastered and decorated?
A good answer: A realistic time for the partial rewire, especially for a kitchen or bathroom you use every day.
Getting the quote right
- The circuits being replaced, by room
- Whether a new consumer unit is included, by make and type
- Testing of the remaining circuits and how faults found will be priced
- Making good stated as included or excluded
- Who actually attends — the electricians doing the rewire, employed or subcontracted — and the business's VAT number, with VAT at 20% shown as its own line
Walk away if
- Recommends a full rewire without testing to show why
- Will connect new circuits to an old board without RCD protection
- No certificate offered for the new circuits
- No scheme registration and no plan to notify building control in England or Wales
- A single price with no list of circuits
What a partial rewiring electrician costs: £1,200–£4,500 per job
A partial rewire is quoted per job from the list of circuits being replaced; a new consumer unit and making good are the usual extra lines. Partial Rewiring price guide →
Guide prices compiled by the Locufy team from published Irish and UK provider price lists and 2026/27 cost guides. Updated 2026.
KNOW WHAT TO LOOK FOR? NOW FIND ONE
Partial rewiring electricians near you, with the badges that matter shown
ID checked, trader status and one score from every review — on the card, before you message anyone. Nearest first. No account needed to look.
Or post the job free and let them come to you.
- Test firstThe existing installation is tested to decide which circuits are replaced.
- IsolateThe circuits being replaced are isolated; the rest of the house stays live where it is safe.
- InstallNew cables, back boxes and accessories for the replaced circuits; the board changed if agreed.
- TestNew circuits are tested to BS 7671 before they are energised.
- Certify and reportElectrical Installation Certificate for the new work, a note on the remaining circuits, and notification through the scheme.
- Ring final circuit
- A socket circuit wired in a loop from the board and back.
- Radial circuit
- A circuit that runs out from the board without returning.
- RCD protection
- The safety switch cover that new circuits need.
- EICR
- The inspection of existing wiring that shows which circuits to replace.
- Making good
- Filling and plastering after cables are buried in walls.
- Compliance certificate
- The scheme's confirmation that notifiable work meets the Building Regulations.
AFTER
When the job is done
Hiring a partial rewiring electrician: questions people ask
Yes in England and Wales, because it installs new circuits: a scheme-registered electrician self-certifies it, or building control is notified before work starts.
An Electrical Installation Certificate for the new circuits, and a Building Regulations compliance certificate from the scheme afterwards.
£1,200–£4,500 a job, typically around £3,000. The number of circuits, access under floors and a new consumer unit set the price. The full figures sit in the Partial Rewiring price guide; the postcode search above lists partial rewiring electricians close to you with their prices.
Yes. Ask for the remaining circuits to be tested and any faults reported, so new work is not connected to a fault elsewhere.
Scotland has no competent person register and some rewiring in flats needs a building warrant; Northern Ireland has no Part P-style notification scheme for home wiring.
Let testing decide. If most circuits fail, a full rewire may cost less in the end; if one does, replace that one.
MORE GUIDES
More hiring guides in electrical
Partial rewiring electricians near you
Sources — checked October 2026
- gov.uk — Approved Document P: electrical safety in dwellings (England)
- Registered Competent Person Electrical register
- gov.uk — building work, replacements and repairs to your home (England)
- gov.wales — building regulations: electrics
- gov.scot — Building Standards Technical Handbook 2022 (domestic), standard 4.5 electrical safety
- gov.scot — Regulation of electricians in Scotland: Scottish building regulations (2019 research report)
- gov.uk — building regulations: use a competent person scheme
- Consumer Rights Act 2015, section 49 — reasonable care and skill
- Consumer Rights Act 2015, section 54 — what you can ask for when a service falls short
- Consumer Contracts Regulations 2013, regulation 30 — the 14-day cancellation period
- Consumer Contracts Regulations 2013, regulation 28 — contracts the cancellation right does not cover
- Consumer Contracts Regulations 2013, regulation 36 — services started within the cancellation period
- Civil Procedure Rules Part 26 — the small claims track limit (England and Wales)
- Scottish Courts and Tribunals — making a claim under simple procedure
- nidirect — the small claims process (Northern Ireland)
- Buildings and construction (VAT Notice 708) — 2.1 Construction services: work to an existing building is normally standard-rated
- GOV.UK — VAT rates
- GOV.UK — Register for VAT: when to register
