HOW TO HIRE · ELECTRICAL · CHECKED OCTOBER 2026
How to hire a generator installer in the UK
The checks, the questions and the paperwork.
A generator must connect through a proper changeover switch. The register check, the siting and fumes questions, and what to keep.
- Search and compare — no account needed
- Nearest to you first
- One score from Google, Trustpilot and Locufy reviews
THE 60-SECOND VERSION
Hiring a generator installer in five steps
- Decide what must stay onHeating, freezer, medical equipment, home office — the list sizes the generator.
- Check the registerIn England and Wales, look up whoever will do the generator connection on the Registered Competent Person Electrical register.
- Insist on a changeover switchNever a generator plugged into a socket to back-feed the house.
- Plan the sitingOutdoors, clear of doors and windows, on a proper base.
- Get the certificateFor the changeover and any new circuit, with test results.
BEFORE YOU BOOK
Check before you book
Registered Competent Person Electrical
In England and Wales, the generator connection is electrical installation work; a new circuit or a replacement consumer unit for it is notifiable. Where the generator connection is notifiable, an electrician on a government-authorised competent person scheme, such as NICEIC or NAPIT, self-certifies it under the Building Regulations; anyone else must notify building control before starting, and you pay for that inspection. Ask who insures the trader doing the generator connection and for how much; public liability is standard. The Consumer Rights Act 2015 covers the generator connection when the provider is a trader, and a contract made off-premises or online can usually be cancelled within 14 days under the Consumer Contracts Regulations 2013 — less what was done if you asked for an early start, and not at all for goods made to your specification.
Look up the business name on the register; it takes a minute and should come before the generator connection. Ask for proof of insurance for the generator connection; the trader and ID-checked badges are on the Locufy profile. electricalcompetentperson.co.uk →
Electrical Installation Certificate
When the generator connection is complete, the changeover arrangement and any new circuit are tested to BS 7671 and recorded on a certificate. Notifiable work such as the generator connection can bring a compliance certificate from the scheme, which gov.uk expects within 8 weeks in England and the Welsh Government within 30 days in Wales.
Ask for the certificate, with the test results filled in, on the day the generator connection is finished. gov.wales →
Carbon monoxide
A fuel generator gives off carbon monoxide. In Scotland any home with a carbon-fuelled appliance needs a carbon monoxide detector in that room, and in England landlords must fit alarms under the 2015 Regulations; a generator running near the house is a good reason for an alarm wherever you live.
Ask where the generator connection puts the exhaust, and fit a carbon monoxide alarm indoors. gov.scot →
Building warrant (Scotland) and Northern Ireland
Scotland has no competent person register for electricians: the generator connection must meet building standard 4.5, which means wiring to BS 7671, and some work, such as rewiring a flat, needs a building warrant that the owner applies for. For the generator connection in Northern Ireland, the building regulations contain no Part P-style notification scheme for domestic wiring.
For a Scottish home, ask the electrician whether the generator connection needs a building warrant and whether they are an approved certifier of construction. gov.scot →
VAT
Expect 20% VAT, the standard rate, on installing a standby generator: a business above the £90,000 registration threshold is required to charge it and to show it separately from the labour and materials.
Ask for the VAT number, and look for VAT as its own line on the generator quote. gov.uk →
A good answer: A changeover switch, manual or automatic, so the generator can never feed back into the network.
A good answer: A load worked out from your list, not the biggest unit on offer.
A good answer: A clear answer; separating essential circuits may mean a new board, which is notifiable in England and Wales.
A good answer: Outdoors on a base, clear of doors, windows and vents.
A good answer: A safe arrangement for petrol, diesel or gas, explained.
A good answer: An Electrical Installation or Minor Works Certificate for the changeover and any new circuit.
Getting the quote right
- Generator model and output, or labour only
- Changeover switch type — manual or automatic
- Consumer unit changes and new circuits
- Base, enclosure and siting work
- Who actually attends — the electrician wiring the changeover, employed or subcontracted — and the business's VAT number, with VAT at 20% shown as its own line
- Certification included
Walk away if
- Suggests a lead from the generator into a socket
- No changeover switch
- Sites the generator in a garage with the door shut
- No certificate for the connection
- Oversells a whole-house unit without a load calculation
What a generator installer costs: £1,000–£15,000 per install
Generator installation is priced per install; a portable unit wired in through a changeover switch is the low end, and a fixed automatic standby generator with its own base and fuel supply costs far more. Generator Installation price guide →
Guide prices compiled by the Locufy team from published Irish and UK provider price lists and 2026/27 cost guides. Updated 2026.
KNOW WHAT TO LOOK FOR? NOW FIND ONE
Generator installers near you, with the badges that matter shown
ID checked, trader status and one score from every review — on the card, before you message anyone. Nearest first. No account needed to look.
Or post the job free and let them come to you.
- Assess the loadEssential circuits listed and the generator sized.
- SiteBase laid outdoors, clear of openings.
- Install the changeoverChangeover switch and any board changes fitted, with the supply isolated.
- TestThe installation tested to BS 7671 and a changeover run.
- Certify and trainCertificate handed over and you shown how to switch over safely.
- Changeover switch
- A switch that connects the house to either the mains or the generator, never both.
- Automatic transfer switch
- A changeover that starts the generator and switches over by itself.
- Back-feed
- Power flowing from a generator into the network, which is dangerous.
- Essential circuits
- The circuits chosen to stay on during a power cut.
- Standby generator
- A fixed generator that starts when the mains fails.
- Carbon monoxide
- The poisonous gas in generator exhaust.
AFTER
When the job is done
Hiring a generator installer: questions people ask
Connecting a generator to the house wiring is electrical installation work; a new circuit or replacement consumer unit for it is notifiable in England and Wales.
An Electrical Installation or Minor Works Certificate for the changeover and any new circuit.
£1,000–£15,000 an installation, typically around £3,500. A portable generator with a changeover switch is the low end; a fixed standby unit costs far more. For the breakdown, see the Generator Installation price guide; put in your postcode above to see generator installers near you and what they charge.
No. Back-feeding through a socket is dangerous; a changeover switch is the safe connection.
Outdoors, on a base, away from doors, windows and vents because of the fumes.
It is a sensible precaution wherever a fuel generator runs near the home, and in Scotland the law requires one in any room with a carbon-fuelled appliance.
MORE GUIDES
More hiring guides in electrical
Generator installers near you
Sources — checked October 2026
- gov.uk — Approved Document P: electrical safety in dwellings (England)
- Registered Competent Person Electrical register
- gov.uk — building work, replacements and repairs to your home (England)
- gov.wales — building regulations: electrics
- gov.scot — Building Standards Technical Handbook 2022 (domestic), standard 4.5 electrical safety
- gov.scot — fire and smoke alarms: the law
- Consumer Rights Act 2015, section 49 — reasonable care and skill
- Consumer Rights Act 2015, section 54 — what you can ask for when a service falls short
- Consumer Contracts Regulations 2013, regulation 30 — the 14-day cancellation period
- Consumer Contracts Regulations 2013, regulation 28 — contracts the cancellation right does not cover
- Consumer Contracts Regulations 2013, regulation 36 — services started within the cancellation period
- Civil Procedure Rules Part 26 — the small claims track limit (England and Wales)
- Scottish Courts and Tribunals — making a claim under simple procedure
- nidirect — the small claims process (Northern Ireland)
- Buildings and construction (VAT Notice 708) — 2.1 Construction services: work to an existing building is normally standard-rated
- GOV.UK — VAT rates
- GOV.UK — Register for VAT: when to register