HOW TO HIRE · ELECTRICAL · CHECKED OCTOBER 2026
How to hire an emergency electrician in the UK
The checks, the questions and the paperwork.
Power off or a burning smell: the one-minute register check, what to ask before anyone sets off, and the paperwork to keep for your insurer.
- Search and compare — no account needed
- Nearest to you first
- One score from Google, Trustpilot and Locufy reviews
THE 60-SECOND VERSION
Hiring an emergency electrician in five steps
- Make it safe firstBurning smell, scorching or water in a fitting: switch off at the main switch and stay clear of anything wet.
- Check the register while you waitIn England and Wales, search the business on the Registered Competent Person Electrical register before you confirm.
- Get the call-out price in writingThe call-out fee, what time it covers and the hourly rate after it, sent as a message before anyone leaves.
- Agree make-safe now, repair laterAt night the job is to make the installation safe; a bigger repair can be quoted in daylight.
- Keep the invoice and the reportYour home insurer will want them, with any Minor Works Certificate for repairs that alter a circuit.
BEFORE YOU BOOK
Check before you book
Registered Competent Person Electrical
In England and Wales, a like-for-like repair is not notifiable, but if the emergency call-out turns into a new circuit or a replacement consumer unit, that part is. Should any part of the emergency call-out be notifiable, the simplest route is an electrician on an authorised competent person scheme such as NICEIC or NAPIT, who self-certifies it; the alternative is notifying building control in advance and paying for its inspection.
Type the business name into the register's search before the emergency call-out is booked. electricalcompetentperson.co.uk →
Electrical Installation Certificate
Where the emergency call-out changes a circuit, the electrician tests it to BS 7671 and records it on a Minor Works Certificate, or an Electrical Installation Certificate for anything new. When the emergency call-out is notifiable, expect the scheme's Building Regulations compliance certificate too: 8 weeks is gov.uk's figure for England, 30 days the Welsh Government's.
Get the certificate and its schedule of results on the day the emergency call-out is completed. gov.wales →
Building warrant (Scotland) and Northern Ireland
Scotland has no competent person register for electricians: the emergency call-out must meet building standard 4.5, which means wiring to BS 7671, and some work, such as rewiring a flat, needs a building warrant that the owner applies for. Northern Ireland's building regulations set no Part P-style notification for home wiring, so the emergency call-out there carries no notification step.
In Scotland, ask whether the emergency call-out needs a warrant and whether the electrician is an approved certifier of construction. gov.scot →
Insurance and trader status
Ask who insures the electrician for public liability before they set off. The Consumer Rights Act 2015 applies to the emergency call-out because you are dealing with a trader, but there is usually no 14-day cancellation: regulation 28 of the Consumer Contracts Regulations 2013 excludes a visit you specifically asked for to carry out urgent repairs.
Get the call-out fee and rate in writing before the visit, and look for the trader and ID-checked badges on the Locufy profile.
VAT
VAT on emergency electrical call-outs, nights and weekends included, is charged at the standard 20%, and any business turning over more than £90,000 a year in taxable sales has to register, add it to the price and set it out on its own line.
Ask for the VAT number, and look for VAT as its own line on the call-out fee as well as the hourly rate. gov.uk →
A good answer: A fixed figure, the time it includes (often the first hour) and the hourly rate after that, sent in writing before the electrician sets off.
A good answer: Yes, with the scheme named. You can check the name while they are on the way.
A good answer: A realistic time, not 'twenty minutes' from someone two counties away. A good emergency electrician will also tell you what to switch off in the meantime.
A good answer: Yes. Making safe, isolating the faulty circuit and restoring power to the rest of the house, is the emergency; a new board or a rewire is not a night job.
A good answer: Common breakers, RCDs and accessories on the van, itemised on the invoice at a stated price.
A good answer: A written note of the fault found, what was done, and any certificate for work that altered a circuit.
A good answer: An honest view: a tripped RCD from a faulty appliance is solved; an intermittent fault in hidden wiring may need a daytime visit to trace.
Getting the quote right
- The call-out fee and the time it covers, stated before the visit
- The hourly rate after the first period, and when night or weekend rates apply
- Parts itemised by type and price
- Who actually attends — the electrician sent out tonight, employed or subcontracted — and the business's VAT number, with VAT at 20% shown as its own line
- Make-safe work kept separate from any follow-up repair quote
Walk away if
- No price at all until they arrive, or 'it depends' with no hourly rate
- A demand for card payment in full before they look at the fault
- Pressure to replace the consumer unit on the night
- No name, no business address and no entry on the competent person register in England or Wales
- Advice to switch the power back on before the fault is found
What an emergency electrician costs: £60–£250 per job
Emergency electricians charge a call-out fee that covers attending and the first period of work, then an hourly rate, with higher rates at night and weekends; parts are extra. Emergency Electrician price guide →
Guide prices compiled by the Locufy team from published Irish and UK provider price lists and 2026/27 cost guides. Updated 2026.
KNOW WHAT TO LOOK FOR? NOW FIND ONE
Emergency electricians near you, with the badges that matter shown
ID checked, trader status and one score from every review — on the card, before you message anyone. Nearest first. No account needed to look.
Or post the job free and let them come to you.
- Phone triageThe electrician asks what happened and tells you what to switch off; the call-out fee and rate are agreed before they set off.
- Find the faultOn arrival they isolate the affected circuit and test to locate the fault rather than guess.
- Make safeThe faulty circuit or fitting is disconnected and the rest of the house is restored where it is safe to do so.
- Repair or quoteA simple repair is done there and then; anything bigger is quoted for a daytime visit.
- Report and invoiceYou get a written note of the fault, what was done, any certificate and an itemised invoice.
- Call-out fee
- The charge for attending, usually covering the first period of work.
- Make safe
- Isolating a dangerous circuit or fitting so the rest of the home can be used.
- RCD trip
- The safety switch cutting power because current is leaking, often through a faulty appliance.
- Isolation
- Switching off and locking off a circuit before work.
- Minor Works Certificate
- The certificate for a repair or small alteration to an existing circuit.
- Insulation resistance test
- A test that shows whether cable insulation has broken down or got wet.
AFTER
When the job is done
Hiring an emergency electrician: questions people ask
Repairs and like-for-like replacements are not notifiable in England and Wales, so registration is not a legal requirement for a make-safe visit. If the work becomes a new circuit or consumer unit, a scheme electrician self-certifies it, or building control must be told.
A Minor Works Certificate if a circuit was altered, or an Electrical Installation Certificate if something new was installed; for a simple make-safe, a written report of the fault.
£60–£250 a job, typically around £150. The call-out fee comes first; nights, weekends and parts push it up. For what is usually included, read the Emergency Electrician price guide; enter a postcode above to compare emergency electricians locally.
Switch off at the main switch if anything is burning, scorched or wet, keep away from wet electrics, and leave the consumer unit cover on.
Once, after unplugging appliances. If it trips again straight away, leave it off and wait for the electrician.
That depends on your policy; keep the invoice and the fault report so the insurer can see what failed and why.
MORE GUIDES
More hiring guides in electrical
Emergency electricians near you
Sources — checked October 2026
- gov.uk — Approved Document P: electrical safety in dwellings (England)
- Registered Competent Person Electrical register
- gov.uk — building work, replacements and repairs to your home (England)
- gov.wales — building regulations: electrics
- gov.scot — Building Standards Technical Handbook 2022 (domestic), standard 4.5 electrical safety
- gov.uk — building regulations: when you do not need approval
- gov.uk — building regulations: use a competent person scheme
- Consumer Contracts Regulations 2013, regulation 28 — contracts the cancellation right does not cover
- Consumer Rights Act 2015, section 49 — reasonable care and skill
- Consumer Rights Act 2015, section 54 — what you can ask for when a service falls short
- Consumer Contracts Regulations 2013, regulation 30 — the 14-day cancellation period
- Consumer Contracts Regulations 2013, regulation 36 — services started within the cancellation period
- Civil Procedure Rules Part 26 — the small claims track limit (England and Wales)
- Scottish Courts and Tribunals — making a claim under simple procedure
- nidirect — the small claims process (Northern Ireland)
- Buildings and construction (VAT Notice 708) — 2.1 Construction services: work to an existing building is normally standard-rated
- GOV.UK — VAT rates
- GOV.UK — Register for VAT: when to register
