How to hire a groundworker in the UK
The checks, the questions and the paperwork.
No register applies to groundworkers; building control inspects foundations and drains. The checks, the questions and the paperwork.
- Search and compare — no account needed
- Nearest to you first
- One score from Google, Trustpilot and Locufy reviews
THE 60-SECOND VERSION
Hiring a groundworker in five steps
- Have the design readyFoundation and drainage design approved before digging.
- Book building controlFoundations are inspected before concrete goes in.
- Party wall noticeIn England and Wales, for digging near a neighbour's foundations.
- Muck-away by a registered carrierSpoil and waste carried legally.
- Keep the inspection recordBuilding control's sign-off of each stage.
BEFORE YOU BOOK
Check before you book
No register applies
There is no statutory licence or register for groundworkers in any of the four nations, so for the groundworks the legal checks sit on the work: building regulations approval, or a building warrant in Scotland, where one applies. Expect public liability cover for the groundworks, and ask for the insurer's name and the limit. Because you are buying from a trader, the Consumer Rights Act 2015 applies to the groundworks; agreed in your home or at a distance, it usually carries a 14-day cancellation right under the Consumer Contracts Regulations 2013, although work you asked to begin early is paid for and made-to-measure goods are excluded (regulation 28).
Before work starts, ask who will apply for any approval the groundworks needs. Ask for proof of insurance for the groundworks; the trader and ID-checked badges are on the Locufy profile. gov.uk →
Building regulations approval
Foundations, slabs and drains for an extension are part of the approved building work; building control inspects the groundworks at the stages it sets. Under a full plans application in England, building control should issue the completion certificate for the groundworks within 8 weeks of the work ending, if it meets the regulations.
Before the groundworks begins, ask to see the building control approval or reference. gov.uk →
Party wall notice
If the groundworks touches a shared wall or is close to the boundary in England or Wales, the Party Wall etc. Act 1996 means notifying the neighbours first; this is separate from building regulations, and Scotland follows other rules.
Ask who will serve the party wall notices for the groundworks, and how long before work starts. gov.uk →
Waste carrier registration
Anyone carrying the waste from the groundworks away as a business must be a registered waste carrier — with the Environment Agency in England, Natural Resources Wales, SEPA in Scotland or DAERA in Northern Ireland — and section 34 of the Environmental Protection Act 1990 puts a duty on householders to use an authorised person.
Ask who removes the waste from the groundworks and check their registration number on the right nation's register. gov.uk →
VAT
Groundwork for an existing home is standard-rated, so VAT is 20%; a firm with taxable turnover over £90,000 must be VAT-registered, charge that 20% and show it as a separate line on the quote and invoice.
Ask for the VAT number, and look for VAT as its own line on the groundworks quote, muck-away included. gov.uk →
A good answer: The designed depth, and how building control's call on the ground is priced.
A good answer: Named, before concrete is poured.
A good answer: To the right sewer or soakaway, with any approval needed.
A good answer: A registered waste carrier, priced per load.
A good answer: Rates for extra depth or concrete agreed in advance.
A good answer: Access checked, with protection for drives and paths.
Getting the quote right
- Excavation, foundations, slab and drainage itemised
- Extra depth priced per metre
- Muck-away loads and carrier
- Plant hire and access
- Who actually attends — the groundworkers and the plant operator, employed or subcontracted — and the business's VAT number, with VAT at 20% shown as its own line
Walk away if
- Pours concrete before building control inspects
- No registered carrier for spoil
- Digs near a neighbour's wall with no party wall notice
- No allowance for poor ground
- No written price
What a groundworker costs: £2,500–£15,000 per project
Groundworks are priced per project; ground conditions, depth, drainage connections and access for a digger and muck-away lorry set it. Groundworks price guide →
Guide prices compiled by the Locufy team from published Irish and UK provider price lists and 2026/27 cost guides. Updated 2026.
KNOW WHAT TO LOOK FOR? NOW FIND ONE
Groundworkers near you, with the badges that matter shown
ID checked, trader status and one score from every review — on the card, before you message anyone. Nearest first. No account needed to look.
Or post the job free and let them come to you.
- Set outFoundations and drains marked from the drawings.
- ExcavateTrenches dug; spoil loaded for removal.
- InspectBuilding control inspects the trenches.
- Pour and layConcrete poured, drains laid and tested.
- Backfill and slabTrenches backfilled, slab laid.
- Strip foundation
- A continuous concrete strip under walls.
- Trench fill
- A deep trench filled with concrete.
- Muck-away
- Removing soil from site.
- Soakaway
- A pit that lets rainwater soak into the ground.
- Oversite
- The concrete slab over the ground inside the walls.
- Spoil
- Excavated earth.
AFTER
When the job is done
Hiring a groundworker: questions people ask
No licence or register applies; building control inspects the work, and spoil must go with a registered waste carrier.
For approved building work, building control inspects the foundations before concrete is poured.
£2,500–£15,000 a project, typically around £8,000. Ground conditions, trench depth, drainage and access decide it. Our Groundworks price guide explains what moves the figure, and the search above shows groundworkers working near your postcode.
In England and Wales, digging near a neighbour's foundations can need notice under the Party Wall etc. Act 1996.
Taken away by a registered waste carrier; keep the receipts.
Building control may ask for deeper foundations; agree the rate for extra depth first.
MORE GUIDES
More hiring guides in trades & construction
Groundworkers near you
Sources — checked October 2026
- gov.uk — building regulations approval (England)
- gov.uk — building regulations: how to apply
- gov.uk — party walls and building work
- Party Wall etc. Act 1996
- gov.uk — register as a waste carrier, broker or dealer (England)
- Environmental Protection Act 1990, section 34 — the duty of care, including householders
- SEPA — transporting waste: registration
- DAERA — registration of carriers and brokers (Northern Ireland)
- mygov.scot — if a builder is doing the work for you
- nidirect — how to apply for Building Regulations approval
- Consumer Rights Act 2015, section 49 — reasonable care and skill
- Consumer Rights Act 2015, section 54 — what you can ask for when a service falls short
- Consumer Contracts Regulations 2013, regulation 30 — the 14-day cancellation period
- Consumer Contracts Regulations 2013, regulation 28 — contracts the cancellation right does not cover
- Consumer Contracts Regulations 2013, regulation 36 — services started within the cancellation period
- Civil Procedure Rules Part 26 — the small claims track limit (England and Wales)
- Scottish Courts and Tribunals — making a claim under simple procedure
- nidirect — the small claims process (Northern Ireland)
- Buildings and construction (VAT Notice 708) — 2.1 Construction services: work to an existing building is normally standard-rated
- GOV.UK — VAT rates
- GOV.UK — Register for VAT: when to register