How to hire an underpinning contractor in the UK
The checks, the questions and the paperwork.
Underpinning is structural work needing approval, an engineer's design and often party wall notice. The checks, the questions and the paperwork.
- Search and compare — no account needed
- Nearest to you first
- One score from Google, Trustpilot and Locufy reviews
THE 60-SECOND VERSION
Hiring an underpinning contractor in five steps
- Find the cause firstAn engineer's investigation of why the building moved.
- Get the designMethod — mass concrete, mini-piles or resin — chosen by an engineer.
- Get approvalBuilding regulations approval before work.
- Serve party wall noticeIn England and Wales, when next to a neighbour.
- Keep everythingInvestigation, design, approval and guarantee — buyers will ask.
BEFORE YOU BOOK
Check before you book
No register applies
Anyone may trade as one of the underpinning contractors — no licence or register exists in England, Wales, Scotland or Northern Ireland — and what the law regulates in the underpinning is the building work, through approval where it is required. Expect public liability cover for the underpinning, and ask for the insurer's name and the limit. Because you are buying from a trader, the Consumer Rights Act 2015 applies to the underpinning; agreed in your home or at a distance, it usually carries a 14-day cancellation right under the Consumer Contracts Regulations 2013, although work you asked to begin early is paid for and made-to-measure goods are excluded (regulation 28).
Ask whether the underpinning needs building regulations approval, and who is applying for it. Request the current insurance schedule before the underpinning, and look at the profile badges for trader status and ID. gov.uk →
Building regulations approval
The underpinning is structural work on an existing building, so it needs building regulations approval and building control inspects it. In England, a full plans application for the underpinning normally ends with a completion certificate from building control within 8 weeks of completion, provided the work complies.
Get the building control reference for the underpinning before anything starts. gov.uk →
Party wall notice
If the underpinning touches a shared wall or is close to the boundary in England or Wales, the Party Wall etc. Act 1996 means notifying the neighbours first; this is separate from building regulations, and Scotland follows other rules.
Agree who serves party wall notice for the underpinning, and when. gov.uk →
Who holds the client duties (CDM 2015)
On a domestic job, HSE explains, the CDM 2015 client duties move to the contractor — or the principal contractor if the underpinning involves more than one contractor.
Ask who is acting as principal contractor for the underpinning. hse.gov.uk →
VAT
Expect 20% VAT, the standard rate, on underpinning an existing home: a business above the £90,000 registration threshold is required to charge it and to show it separately from the labour and materials.
Ask for the VAT number, and look for VAT as its own line on the underpinning contract. gov.uk →
A good answer: An engineer's answer — clay shrinkage, a leaking drain, trees — before any fix.
A good answer: Mass concrete, mini-piles or resin, chosen for the ground and the building.
A good answer: A structural engineer, with calculations for building control.
A good answer: Named, in time, in England and Wales.
A good answer: Drains repaired or trees managed, so the movement does not return.
A good answer: Written, with its length and who backs it.
Getting the quote right
- Length of wall and method
- Design and investigation
- Building control and party wall costs
- Drain repairs or other cause-related work
- Who actually attends — the underpinning crew and the engineer, employed or subcontracted — and the business's VAT number, with VAT at 20% shown as its own line
- The guarantee
Walk away if
- Underpins without finding the cause
- No engineer's design
- No building control
- Ignores the neighbour's side
- No written guarantee
What an underpinning contractor costs: £5,000–£21,000 per job
Underpinning is priced per job by the length of wall, the method, the ground and access. Underpinning price guide →
Guide prices compiled by the Locufy team from published Irish and UK provider price lists and 2026/27 cost guides. Updated 2026.
KNOW WHAT TO LOOK FOR? NOW FIND ONE
Underpinning contractors near you, with the badges that matter shown
ID checked, trader status and one score from every review — on the card, before you message anyone. Nearest first. No account needed to look.
Or post the job free and let them come to you.
- InvestigateEngineer finds the cause of movement.
- Design and approveMethod designed; building regulations approval and party wall notice.
- Excavate in sequenceShort sections dug so the wall stays supported.
- UnderpinConcrete, piles or resin installed and inspected.
- Make goodCracks repaired and the site reinstated.
- Mass concrete underpinning
- Digging under in sections and filling with concrete.
- Mini-piles
- Small piles driven or bored under the wall.
- Resin injection
- Resin injected into the ground to strengthen it.
- Subsidence
- Downward ground movement under a building.
- Heave
- Upward ground movement, often after trees are removed.
- Party wall award
- The document setting out how work near a neighbour is done.
AFTER
When the job is done
Hiring an underpinning contractor: questions people ask
Yes; it is structural work on an existing building.
No licence or register applies; the engineer's design and building control are the checks.
£5,000–£21,000 a job, typically around £13,500. Length of wall, the method, the ground and access set it. Use the Underpinning price guide to see what pushes a job up or down, and the search above to find underpinning contractors in your postcode.
In England and Wales, underpinning next to a neighbour usually does.
Only if the cause is understood; an engineer should investigate first.
Some home policies cover subsidence; check yours before work.
MORE GUIDES
More hiring guides in trades & construction
Underpinning contractors near you
Sources — checked October 2026
- gov.uk — building regulations approval (England)
- gov.uk — building regulations: how to apply
- gov.uk — party walls and building work
- Party Wall etc. Act 1996
- HSE — CDM 2015: domestic clients
- mygov.scot — if a builder is doing the work for you
- nidirect — how to apply for Building Regulations approval
- Consumer Rights Act 2015, section 49 — reasonable care and skill
- Consumer Rights Act 2015, section 54 — what you can ask for when a service falls short
- Consumer Contracts Regulations 2013, regulation 30 — the 14-day cancellation period
- Consumer Contracts Regulations 2013, regulation 28 — contracts the cancellation right does not cover
- Consumer Contracts Regulations 2013, regulation 36 — services started within the cancellation period
- Civil Procedure Rules Part 26 — the small claims track limit (England and Wales)
- Scottish Courts and Tribunals — making a claim under simple procedure
- nidirect — the small claims process (Northern Ireland)
- Buildings and construction (VAT Notice 708) — 2.1 Construction services: work to an existing building is normally standard-rated
- GOV.UK — VAT rates
- GOV.UK — Register for VAT: when to register