How to hire a foundations contractor in the UK
The checks, the questions and the paperwork.
No register applies; building control inspects foundations before concrete goes in. The checks, the questions and what to keep.
- Search and compare — no account needed
- Nearest to you first
- One score from Google, Trustpilot and Locufy reviews
THE 60-SECOND VERSION
Hiring a foundations contractor in five steps
- Get the designFoundation type and depth from the drawings or an engineer.
- Book the inspectionBuilding control sees the trench before concrete.
- Agree extra-depth ratesIn case the ground is poor.
- Name the concreteMix and any reinforcement specified.
- Keep the recordsInspection sign-off and delivery tickets.
BEFORE YOU BOOK
Check before you book
No register applies
For the foundation work there is no register to search: foundations contractors need no licence anywhere in the UK, and the law bites through building regulations approval, or Scotland's building warrant, when the work calls for it. Expect public liability cover for the foundation work, and ask for the insurer's name and the limit. Because you are buying from a trader, the Consumer Rights Act 2015 applies to the foundation work; agreed in your home or at a distance, it usually carries a 14-day cancellation right under the Consumer Contracts Regulations 2013, although work you asked to begin early is paid for and made-to-measure goods are excluded (regulation 28).
Before work starts, ask who will apply for any approval the foundation work needs. Before booking the foundation work, ask to see current insurance and check the Locufy profile for its trader and ID badges. gov.uk →
Building regulations approval
Foundations for an extension or new building are part of the approved building work, and building control inspects the excavations before the foundation work is concreted. Where the foundation work goes through a full plans application in England, building control usually issues a completion certificate within 8 weeks of the work finishing, if it complies.
Before the foundation work begins, ask to see the building control approval or reference. gov.uk →
Party wall notice
Under the Party Wall etc. Act 1996 you must tell neighbours in England and Wales before building work on or near a shared wall or boundary, and the foundation work often is; a party wall agreement is separate from building regulations approval. Scotland has different rules.
Agree who serves party wall notice for the foundation work, and when. gov.uk →
Building warrant (Scotland)
Scotland puts the warrant duty on the owner: if the foundation work needs a building warrant and there is none, the council can fine you and order the work taken out, whoever built it. Northern Ireland asks you to notify the council's building control before the foundation work begins.
In Scotland, see the warrant before the foundation work begins; in Northern Ireland, ask for the building control reference. mygov.scot →
VAT
Expect 20% VAT, the standard rate, on foundation and concrete work for an existing home: a business above the £90,000 registration threshold is required to charge it and to show it separately from the labour and materials.
Ask for the VAT number, and look for VAT as its own line on the foundations quote, extra depth included. gov.uk →
A good answer: Strip, trench fill, raft or piles, from the design and the ground.
A good answer: Named, before any concrete.
A good answer: Specified, with delivery tickets kept.
A good answer: A rate per metre agreed in advance.
A good answer: Considered in the design, since both affect depth.
A good answer: Planned, with protection for drives.
Getting the quote right
- Foundation type, dimensions and depth
- Extra depth priced per metre
- Concrete mix and reinforcement
- Muck-away and access
- Who actually attends — the groundworkers and the concrete gang, employed or subcontracted — and the business's VAT number, with VAT at 20% shown as its own line
Walk away if
- Pours before inspection
- No design or depth stated
- No allowance for poor ground
- Spoil dumped without a registered carrier
- No written price
What a foundations contractor costs: £2,000–£15,000 per project
Foundations are priced per project; type, ground conditions, the depth building control asks for and access set the figure. Concrete & Foundations Specialist price guide →
Guide prices compiled by the Locufy team from published Irish and UK provider price lists and 2026/27 cost guides. Updated 2026.
KNOW WHAT TO LOOK FOR? NOW FIND ONE
Foundations contractors near you, with the badges that matter shown
ID checked, trader status and one score from every review — on the card, before you message anyone. Nearest first. No account needed to look.
Or post the job free and let them come to you.
- DesignFoundation type and depth set for the ground.
- ExcavateTrenches dug to depth.
- InspectBuilding control inspects before concrete.
- ConcreteReinforcement placed and concrete poured.
- Cure and continueConcrete cured before walls are built.
- Strip foundation
- A concrete strip under walls.
- Raft foundation
- A reinforced slab under the whole building.
- Pile
- A column driven or bored deep into the ground.
- Reinforcement
- Steel bars or mesh in concrete.
- Bearing capacity
- How much load the ground can take.
- Delivery ticket
- The record of the concrete supplied.
AFTER
When the job is done
Hiring a foundations contractor: questions people ask
No licence or register applies; building control inspects the work.
For approved building work, the excavations are inspected before concrete is poured.
£2,000–£15,000 a project, typically around £7,000. Foundation type, ground conditions, depth and access set it. There is a line-by-line breakdown in the Concrete & Foundations Specialist price guide, and the postcode box above brings up foundations contractors in your area.
Clay soils, trees and drains can mean building control asks for more depth.
In England and Wales, digging near a neighbour's foundations can need notice.
As the design and supplier advise; ask before walls go up.
MORE GUIDES
More hiring guides in trades & construction
Foundations contractors near you
Sources — checked October 2026
- gov.uk — building regulations approval (England)
- gov.uk — building regulations: how to apply
- gov.uk — party walls and building work
- Party Wall etc. Act 1996
- mygov.scot — if a builder is doing the work for you
- nidirect — how to apply for Building Regulations approval
- Consumer Rights Act 2015, section 49 — reasonable care and skill
- Consumer Rights Act 2015, section 54 — what you can ask for when a service falls short
- Consumer Contracts Regulations 2013, regulation 30 — the 14-day cancellation period
- Consumer Contracts Regulations 2013, regulation 28 — contracts the cancellation right does not cover
- Consumer Contracts Regulations 2013, regulation 36 — services started within the cancellation period
- Civil Procedure Rules Part 26 — the small claims track limit (England and Wales)
- Scottish Courts and Tribunals — making a claim under simple procedure
- nidirect — the small claims process (Northern Ireland)
- Buildings and construction (VAT Notice 708) — 2.1 Construction services: work to an existing building is normally standard-rated
- GOV.UK — VAT rates
- GOV.UK — Register for VAT: when to register