HOW TO HIRE · ELECTRICAL

How to hire an EV charger installer in the UK
The checks, the questions and the paperwork.

A home EV charger is notifiable work in England and Wales and must be a smart charge point in Great Britain. The checks, the questions and the paperwork.

  • Search and compare — no account needed
  • Nearest to you first
  • One score from Google, Trustpilot and Locufy reviews

THE 60-SECOND VERSION

Hiring an EV charger installer in five steps

  1. Photograph the board and the driveThe consumer unit, the meter and the route to where the car parks — the cable run sets the price.
  2. Search the registerBefore you book the charger installation in England or Wales, find the business on the Registered Competent Person Electrical register.
  3. Confirm the charger is smartCharge points sold for home use in England, Wales and Scotland must meet the 2021 smart charge point rules.
  4. Ask about earthing and the supplyOutdoor charging may need extra earth protection, and the main fuse may need checking.
  5. Get both certificatesElectrical Installation Certificate on the day; compliance certificate from the scheme after.

BEFORE YOU BOOK

Check before you book

Registered Competent Person Electrical

In England and Wales, the charger installation adds a new circuit from the consumer unit, which is notifiable work, and in Wales outdoor electrical work is notifiable as well. That leaves two routes for the charger installation: an electrician registered with an authorised competent person scheme such as NICEIC or NAPIT certifies it under the Building Regulations, or building control is told in advance and charges you to inspect. Ask who insures the trader doing the charger installation and for how much; public liability is standard. The Consumer Rights Act 2015 covers the charger installation when the provider is a trader, and a contract made off-premises or online can usually be cancelled within 14 days under the Consumer Contracts Regulations 2013 — less what was done if you asked for an early start, and not at all for goods made to your specification.

Look up the business name on the register; it takes a minute and should come before the charger installation. See the insurance certificate before you confirm the charger installation; the Locufy profile shows the trader and ID-checked badges. electricalcompetentperson.co.uk →

Electrical Installation Certificate

The charger's new circuit is tested to BS 7671 and recorded on an Electrical Installation Certificate. Because the charger installation is notifiable, the scheme also issues a Building Regulations compliance certificate: gov.uk says within 8 weeks in England, and the Welsh Government says the electrician should arrange it within 30 days.

Get the certificate and its schedule of results on the day the charger installation is completed. gov.wales →

Smart charge point rules

The 2021 smart charge point Regulations for electric vehicles, which extend to England, Wales and Scotland, bar the sale of a home or workplace charge point that does not meet their requirements on smart functions, off-peak charging, randomised delay and security.

Ask for the charger's make and model and confirm it meets the 2021 Regulations. legislation.gov.uk →

Building warrant (Scotland) and Northern Ireland

In Scotland there is no equivalent register; the charger installation is judged against building standard 4.5 (wiring to BS 7671), and certain work — rewiring a flat is the usual example — needs a building warrant, which the owner obtains. In Northern Ireland, the charger installation comes under building regulations with no Part P-style notification scheme for home wiring.

For a Scottish home, ask the electrician whether the charger installation needs a building warrant and whether they are an approved certifier of construction. gov.scot →

VAT

HMRC puts installing a home EV charge point at the standard rate of 20%; once a trader's taxable turnover passes £90,000 it must register, charge the 20% and list it apart from the price of the work.

Ask for the VAT number, and look for VAT as its own line on the charge point quote. gov.uk →

“Is the charger a smart charge point under the 2021 Regulations?”

A good answer: Yes, with the model named. In England, Wales and Scotland a non-compliant home charge point should not be on sale at all.

“How will you earth the charger?”

A good answer: A clear plan for outdoor charging protection — an earth rod or a protective device in the unit — explained, not skipped.

“Is the main fuse big enough, and who checks it?”

A good answer: A look at the incoming supply and the house's existing load; if the network operator needs to be involved, the installer explains how.

“Does the consumer unit need work?”

A good answer: A reasoned answer: spare space and RCD protection, or a board upgrade priced separately.

“What is the cable route?”

A good answer: From the board to the charger, through which walls, how it is protected outside, and how long.

“Tethered or untethered?”

A good answer: The difference explained, and the price of each, so you choose.

“Which certificates will I get?”

A good answer: An Electrical Installation Certificate on the day and a compliance certificate from the scheme.

Getting the quote right

  • The charger make and model, and confirmation it meets the 2021 smart charge point rules
  • The cable run length and route included
  • Earthing arrangement and any earth rod or protective device
  • Consumer unit work priced as a separate line
  • Who actually attends — the electrician fitting the charger, employed or subcontracted — and the business's VAT number, with VAT at 20% shown as its own line
  • Testing, certification and scheme notification included

Walk away if

  • No mention of earthing for an outdoor charge point
  • Not on the competent person register in England or Wales
  • A 'smart' charger with no model number on the quote
  • No visit or photos before quoting a long cable run
  • No certificate offered for the new circuit
LOW
£700
TYPICAL
£1,100
HIGH
£1,500

What an EV charger installer costs: £700–£1,500 per install

EV charger installation is priced per install; a charger beside the consumer unit is the cheap end, and a long cable run, earthing work or a board upgrade push it up. EV Charger Installation price guide →

Guide prices compiled by the Locufy team from published Irish and UK provider price lists and 2026/27 cost guides. Updated 2026.

KNOW WHAT TO LOOK FOR? NOW FIND ONE

EV charger installers near you, with the badges that matter shown

ID checked, trader status and one score from every review — on the card, before you message anyone. Nearest first. No account needed to look.

Or post the job free and let them come to you.

  1. SurveyThe installer checks the supply, the consumer unit, the earthing and the cable route.
  2. IsolateThe supply is isolated before the new circuit is connected at the board.
  3. InstallThe cable is run and protected, the charger mounted and the earthing arrangement fitted.
  4. Test and commissionThe circuit is tested to BS 7671 and the charger commissioned and connected to its app.
  5. CertifyElectrical Installation Certificate handed over and the work notified through the scheme.

Smart charge point
A charger that meets the 2021 Regulations' smart, off-peak and security requirements.
Tethered
A charger with its cable fixed on; untethered chargers use your own cable.
Earth rod
A rod driven into the ground to give the charger its own earth.
Main fuse
The supplier's fuse on the incoming supply, which limits the total load.
Randomised delay
A short random wait before charging starts, required by the 2021 Regulations.
Compliance certificate
The scheme's confirmation that notifiable work meets the Building Regulations.

AFTER

When the job is done

Keep the certificatesThe Electrical Installation Certificate, the compliance certificate from the scheme, and the charger's commissioning record.
Test a chargeCharge the car with the installer there; check the app or schedule works and the RCD test button.
Register the warrantyThe charger warranty and any app account set up in your name.
Rate the workOnly booked jobs can be reviewed on Locufy, so yours carries weight; if the charger installation falls short, use the make-it-right step first and the provider is asked to fix it before the review is published.

MONEY BACK

Grants that may apply

GOV.UK (OFFICE FOR ZERO EMISSION VEHICLES) · GRANTVerified 18 August 2026

Electric Vehicle Chargepoint Grant

75% off the cost of buying and installing a chargepoint socket, up to £500.

Who: People who rent their home or own a flat (a separate version of the grant is available for landlords).

Official details on gov.uk →

Schemes change. The amounts above were checked on the dates shown; the official page is the one that counts.

STEP 1Complain to the electrician firstEmail or message so there is a record, setting out the defect in the charger installation and what you expect. A trader owes reasonable care and skill under the Consumer Rights Act 2015; the remedies it sets are a second attempt, then a price reduction.
STEP 2Use Locufy's make-it-right stepRate the charger installation under four stars and you are asked whether to send it to the provider first; we follow it through. Then the review goes up.
STEP 3Unsafe or uncertified workBuilding control at your council handles notifiable electrical work in England and Wales that was left uncertified, so tell them if the charger installation falls into that gap; the scheme the electrician belongs to can chase a compliance certificate that never arrived. For a dispute about the charger installation with the trader, Trading Standards is reached through the Citizens Advice consumer helpline on 0808 223 1133 in England and Wales, Advice Direct Scotland on 0808 800 9060, or Consumerline on 0300 123 6262 in Northern Ireland.
STEP 4Money still in disputeIf the charger installation is still not settled, you can claim without a solicitor: the small claims track takes claims up to £10,000 in England and Wales, simple procedure up to £5,000 in Scotland, and the small claims court up to £5,000 in Northern Ireland.

Hiring an EV charger installer: questions people ask

In England and Wales it is a new circuit and therefore notifiable: a scheme-registered electrician self-certifies it, or building control is notified before work starts.

An Electrical Installation Certificate with the test results, and a Building Regulations compliance certificate from the scheme afterwards.

£700–£1,500 an installation, typically around £1,100. The cable run, the charger model, earthing work and any board upgrade decide the price. For what is usually included, read the EV Charger Installation price guide; enter a postcode above to compare EV charger installers locally.

In England, Wales and Scotland, yes: the 2021 Regulations bar the sale of home charge points that do not meet their smart requirements.

The 2021 smart charge point Regulations extend to Great Britain only. Northern Ireland has no Part P-style notification for home wiring, so ask for an Electrical Installation Certificate to BS 7671 all the same.

No: a charger needs its own circuit from the consumer unit.

MORE GUIDES

More hiring guides in electrical

EV charger installers near you

Sources — checked October 2026

  1. gov.uk — Approved Document P: electrical safety in dwellings (England)
  2. Registered Competent Person Electrical register
  3. gov.uk — building work, replacements and repairs to your home (England)
  4. gov.wales — building regulations: electrics
  5. gov.scot — Building Standards Technical Handbook 2022 (domestic), standard 4.5 electrical safety
  6. Electric Vehicles (Smart Charge Points) Regulations 2021
  7. gov.uk — building regulations: use a competent person scheme
  8. Consumer Rights Act 2015, section 49 — reasonable care and skill
  9. Consumer Rights Act 2015, section 54 — what you can ask for when a service falls short
  10. Consumer Contracts Regulations 2013, regulation 30 — the 14-day cancellation period
  11. Consumer Contracts Regulations 2013, regulation 28 — contracts the cancellation right does not cover
  12. Consumer Contracts Regulations 2013, regulation 36 — services started within the cancellation period
  13. Civil Procedure Rules Part 26 — the small claims track limit (England and Wales)
  14. Scottish Courts and Tribunals — making a claim under simple procedure
  15. nidirect — the small claims process (Northern Ireland)
  16. Buildings and construction (VAT Notice 708) — 2.1 Construction services: work to an existing building is normally standard-rated
  17. GOV.UK — VAT rates
  18. GOV.UK — Register for VAT: when to register