PRICE GUIDE · TRADES & CONSTRUCTION

Loft Conversion cost in the UK
£30,000–£95,000 per project. Typically £42,000.

Loft conversions in the UK cost £30,000–£95,000, and a rear dormer — the most common type — is typically about £42,000. Roof shape and conversion type drive it: a roof-light conversion is cheapest, hip-to-gable and mansard conversions dearest, with an en-suite and London prices adding more.

  • Search and compare — no account needed
  • Nearest to you first
  • One score from Google, Trustpilot and Locufy reviews

HOW MUCH IT COSTS

How much does loft conversion cost in the UK?

LOFT CONVERSION PRICE · PER PROJECT · THE UK
Low end£30,000a roof-light or simple rear dormer outside London
Typical£42,000what most people pay
High end£95,000a mansard with an en-suite, in London
Typical £42,000
£30,000 low£95,000 high

Locufy guide prices for 2026–2027. Updated 2026. A national range, not a quote — enter your town above for real prices from the builders and trades near you.

What moves the price

  • Type of loft conversion — roof windows only cost least, then a rear dormer, hip-to-gable and mansard
  • Head height — a loft without enough height may need the ceiling below lowered or the roof raised
  • En-suite bathroom — plumbing, drainage and tiling in the loft add thousands to the conversion
  • Stairs and fire safety — a new staircase, fire doors and a protected escape route are required
  • Structural steel — beams and new floor joists are designed by an engineer and add to the cost
  • London and terraced streets — access, party walls and higher labour rates make lofts there dearer
+6%PRICE TREND · 5 YEARS

Building and repair prices in the UK are up 6% over five years (ONS Consumer Price Inflation, Services for maintenance and repair, to 2026 August). Five years ago a typical loft conversion would have cost about £47350 — an estimate from today's guide price and that index, not a recorded price. Source: ONS MM23 D7DO →

WHAT YOU GET

What a loft conversion booking includes

Design and approvalsDrawings, structural calculations and building regulations approval for the loft.
Structure and dormerNew floor joists, steel beams and the dormer or gable built out.
Stairs, insulation and fire protectionA new staircase, insulated roof and walls, and fire doors on the escape route.
Windows and finishingRoof windows or dormer glazing fitted, then plastering, electrics and heating.

Takes: Six to twelve weeks on site for most loft conversions. Not included: Party wall surveyor fees, furniture, fitted wardrobes, decorating and any planning application fee are usually priced separately — see the related guides below.

WHAT PEOPLE BOOK

Common loft conversion jobs

Rear dormer on a terraceA box dormer adding a double bedroom to a terrace in Walthamstow.
Roof-light loft roomA study made with roof windows in the loft of a semi in Morley.
Hip-to-gable with dormerA hipped roof extended to a gable on a semi in Sutton Coldfield.
Mansard conversionA mansard loft with a bedroom and en-suite on a house in Finchley.
Bungalow loftTwo bedrooms added in the roof of a bungalow in Kirkintilloch.
Loft with en-suiteA main bedroom and shower room in the loft of a house in Portishead.

KNOW THE PRICE? NOW SEE THE REAL ONES

Loft Conversion near you, with prices shown

The builders and trades that cover your area, nearest first, each with their price and one score from every review. No account needed to look.

Or post the job free and let them come to you.

How to pay less

  • Choose a roof-light or rear dormer loft conversion rather than a mansard if the space works
  • Place a loft en-suite above the existing bathroom so pipework and drainage runs stay short
  • Check permitted development limits early so the loft is designed without a planning application

Before you book

  • Every loft conversion needs building regulations approval for structure, insulation, stairs and fire safety
  • Many dormer and roof-light lofts are permitted development, but mansards and front dormers usually need planning permission
  • Serve party wall notices on attached neighbours before steel goes into a shared wall
  • Ask a bat survey question early if the roof is old, as bats in a loft are protected

Loft Conversion cost: questions people ask

£30,000–£95,000 per project, about £42,000 typical for a rear dormer. A simple roof-light loft costs least; a mansard with an en-suite in London costs the most.

Six to twelve weeks on site for most homes, after design and approvals. A mansard or a loft with a bathroom takes longer.

Often not. A rear dormer within the permitted development volume limits can usually go ahead without it, but mansards, front dormers, flats and homes in conservation areas typically need permission. Building regulations approval is needed in every case.

Most lofts with enough head height under the ridge can be converted. Low roofs or trussed rafters make it harder and dearer, so get a survey first.

Party wall surveyor fees, furniture, fitted storage and decoration are generally extra.

They are Locufy guide prices for the UK, drawn up from published UK loft conversion cost guides — a national range, not a quote. The type of loft and your region set the real cost.