HOW TO HIRE · GARDEN & OUTDOOR · CHECKED OCTOBER 2026
How to hire a driveway contractor in the UK
The checks, the questions and the paperwork.
No register covers driveway contractors. Check the drainage rule, the dropped kerb and the base depth — and never buy a drive at the door.
- Search and compare — no account needed
- Nearest to you first
- One score from Google, Trustpilot and Locufy reviews
THE 60-SECOND VERSION
Hiring a driveway contractor in five steps
- Never agree at the doorGet three written quotes from contractors you approached.
- Ask how the drive drainsPermeable, or falls to a soakaway or lawn. In England the planning rule depends on it.
- Get the build-up in writingDig depth, sub-base, surface and edging.
- Check the dropped kerbApproved by the council before the crossing is built.
- Ask for the waste carrier numberTonnes of spoil leave a drive dig.
BEFORE YOU BOOK
Check before you book
No register applies
No law licenses driveway contractors in England, Wales, Scotland or Northern Ireland, and TrustMark — the Government Endorsed Quality Scheme — is voluntary. What the law does regulate is the work: how the drive drains, the crossing over the pavement and the spoil.
Ask for addresses of finished jobs and, if they claim TrustMark, search the business on trustmark.org.uk. trustmark.org.uk →
Front-garden drainage (England) and the dropped kerb
In England, Class F of the General Permitted Development (England) Order 2015 lets a driveway contractor pave more than 5 square metres between the house and the road without planning permission only if the surface is porous, or the water runs to a permeable area within your boundary. A dropped kerb, so a car can cross the pavement onto a new drive, is applied for through your council in England and Wales; driving over a full kerb is not the answer.
Ask the driveway contractor how the surface drains, in writing. Ask the driveway contractor whether the council's approval is in place before they quote for the crossing. legislation.gov.uk →
Waste carrier registration
A driveway contractor who drives away the dug-out soil and old surface is transporting waste as a business, which needs registration: with the Environment Agency in England, Natural Resources Wales, SEPA in Scotland or the NIEA in Northern Ireland.
Ask for the carrier number and search it on the public register before anything leaves. environment.data.gov.uk →
Cancelling a doorstep deal
The Consumer Contracts Regulations 2013 give you 14 days to cancel a service agreed at your home; if you are never told about that right, the period can run for up to 12 months.
If you agreed at the door, check the paperwork names your cancellation right. legislation.gov.uk →
VAT
A new driveway is standard-rated, so VAT on it is 20%. A driveway contractor whose turnover is above £90,000 must be registered, charge it and print the 20% separately on the written quote.
Ask for the driveway contractor's VAT number and check it against the business name on the written quote. gov.uk →
A good answer: A reason tied to use, slope, drainage and budget — block, resin-bound, tarmac or gravel.
A good answer: Permeable build or falls to a soakaway or bed, never onto the road.
A good answer: A depth in millimetres suited to cars.
A good answer: Yes or no, and who applies to the council.
A good answer: A registered carrier or skip firm, with the number.
A good answer: Written, with the period and what it covers.
A good answer: Staged or on completion; not a large cash deposit.
Getting the quote right
- Area, surface and edging named
- Dig depth and sub-base
- Drainage design
- Dropped kerb: included, or who applies
- Spoil removal and the carrier number
- The guarantee, in writing, with its length
- Who actually attends to dig out and lay the drive, and whether they are employed or subcontracted
- The VAT number, with 20% VAT set out apart from materials and labour
Walk away if
- A door-knock offer with "leftover" material
- Pressure to sign today
- No cancellation information for a deal agreed at home
- Cash only, large deposit
- Water directed onto the road
What a driveway contractor costs: £40–£134 per m²
Driveways are priced per square metre; the surface chosen, the depth of the dig and base, drainage and any kerb work set the price. Driveway Paving price guide →
Guide prices compiled by the Locufy team from published Irish and UK provider price lists and 2026/27 cost guides. Updated 2026.
KNOW WHAT TO LOOK FOR? NOW FIND ONE
Driveway contractors near you, with the badges that matter shown
ID checked, trader status and one score from every review — on the card, before you message anyone. Nearest first. No account needed to look.
Or post the job free and let them come to you.
- SurveyLevels, drains and the kerb checked.
- ExcavateOld surface and soil removed to depth by a registered carrier.
- BaseSub-base laid and compacted to falls; edging set.
- SurfaceBlocks, resin, tarmac or gravel laid.
- FinishJoints, drains and kerb completed, site cleared.
- Sub-base
- The compacted stone layer under the surface.
- Falls
- The slope that carries water away.
- Soakaway
- A buried pit for drainage.
- Permeable surface
- One that lets water through.
- Dropped kerb
- A lowered kerb that lets cars cross the pavement.
- Edging
- The kerb or border that holds the surface in place.
AFTER
When the job is done
Hiring a driveway contractor: questions people ask
In England, only if more than 5 square metres of front garden is paved with a surface that neither lets water through nor drains to a permeable area within the property.
Usually within 14 days under the Consumer Contracts Regulations 2013; if you were not told about the right, the period can extend up to 12 months.
Between £40 and £134 a square metre; about £85 is typical. Read the driveway paving price guide for the detail, and search your area above for local prices.
If cars cross the pavement, yes; apply through the council in England and Wales.
A well-laid block or resin drive on a good base lasts many years; the base matters more than the surface.
The law has no licence and no register for driveway contractors.
MORE GUIDES
More hiring guides in garden & outdoor
Driveway contractors near you
Sources — checked October 2026
- Town and Country Planning (General Permitted Development) (England) Order 2015, Schedule 2 Part 1 — outbuildings and hard surfaces
- gov.uk — permeable surfacing of front gardens: guidance
- gov.uk — apply for a dropped kerb (England and Wales)
- gov.uk — register as a waste carrier, broker or dealer (England)
- Environment Agency — public register of waste carriers
- Consumer Contracts Regulations 2013, regulation 30 — the 14-day cancellation period
- TrustMark — the Government Endorsed Quality Scheme
- Consumer Rights Act 2015, section 54 — what you can ask for when a service falls short
- Civil Procedure Rules Part 26 — the small claims track (England and Wales)
- mygov.scot — make a court claim for money (simple procedure)
- nidirect — the small claims process (Northern Ireland)
- Buildings and construction (VAT Notice 708) — 2.1 Construction services: work to an existing building is normally standard-rated
- GOV.UK — VAT rates
- GOV.UK — Register for VAT: when to register
