HOW TO HIRE · TRADES & CONSTRUCTION · CHECKED OCTOBER 2026
How to hire a stonemason in the UK
The checks, the questions and the paperwork.
No register applies to stonemasons. The checks on stone, mortar and access, the questions to ask, and what to look at before paying.
- Search and compare — no account needed
- Nearest to you first
- One score from Google, Trustpilot and Locufy reviews
THE 60-SECOND VERSION
Hiring a stonemason in five steps
- Describe the stone and the problemPhotos of the wall, the stone type and the damage.
- Ask about matching stoneSame stone or a close match, from where.
- Agree lime or cementOld stone usually needs lime mortar.
- Check the accessScaffold or tower for high work.
- See the finished faceJoints, tooling and colour before paying.
BEFORE YOU BOOK
Check before you book
No register applies
No law licenses stonemasons in England, Wales, Scotland or Northern Ireland; for the masonry work the law controls the work itself, through building regulations approval where it is needed.
Ask whether the masonry work needs building regulations approval, and who is applying for it. gov.uk →
Building regulations approval
Structural masonry work — rebuilding a load-bearing wall, new openings — is building work needing approval; like-for-like repairs generally are not. If the masonry work is approved on full plans in England, expect building control's completion certificate within about 8 weeks of the finish, as long as it complies.
Before the masonry work begins, ask to see the building control approval or reference. gov.uk →
Building warrant (Scotland)
Scotland puts the warrant duty on the owner: if the masonry work needs a building warrant and there is none, the council can fine you and order the work taken out, whoever built it. Northern Ireland asks you to notify the council's building control before the masonry work begins.
Scottish owners: see the warrant before work on the masonry work starts. In Northern Ireland, get the building control reference. mygov.scot →
Insurance and trader status
Ask who insures the trader doing the masonry work and for how much; public liability is standard. The Consumer Rights Act 2015 covers the masonry work when the provider is a trader, and a contract made off-premises or online can usually be cancelled within 14 days under the Consumer Contracts Regulations 2013 — less what was done if you asked for an early start, and not at all for goods made to your specification.
Request the current insurance schedule before the masonry work, and look at the profile badges for trader status and ID.
VAT
HMRC puts stonemasonry on an existing building at the standard rate of 20%; once a trader's taxable turnover passes £90,000 it must register, charge the 20% and list it apart from the price of the work.
Ask for the VAT number, and look for VAT as its own line on the masonry quote. gov.uk →
A good answer: A named stone matching the existing, or a reasoned alternative.
A good answer: For historic stone, usually yes, with the mix stated.
A good answer: Scaffold or a tower, priced; ladders only for short, low-risk tasks.
A good answer: Photos and an address of comparable stonework.
A good answer: Structural alterations do; like-for-like repair generally does not.
A good answer: A defined job priced, open-ended repairs at a day rate with an estimate.
Getting the quote right
- Stone type and source
- Mortar mix
- Access and scaffold
- Day rate and days, or a fixed price
- Who actually attends — the mason and any labourer, employed or subcontracted — and the business's VAT number, with VAT at 20% shown as its own line
Walk away if
- Cement pointing on soft historic stone
- Cannot name the stone
- High work from ladders all day
- No written price
- Pressure to replace sound stone
What a stonemason costs: £220–£450 per day
Stonemasons charge a day rate or a job price; carving, lime work on older buildings and access set the figure, with stone on top. Stonemason price guide →
Guide prices compiled by the Locufy team from published Irish and UK provider price lists and 2026/27 cost guides. Updated 2026.
KNOW WHAT TO LOOK FOR? NOW FIND ONE
Stonemasons near you, with the badges that matter shown
ID checked, trader status and one score from every review — on the card, before you message anyone. Nearest first. No account needed to look.
Or post the job free and let them come to you.
- SurveyStone, damage and mortar assessed.
- AccessScaffold or tower set up for high work.
- Cut out and prepareDamaged stone and failed mortar removed.
- Repair or rebuildNew stone fitted, rebuilt to line, pointed.
- Finish and protectFace cleaned and new work protected.
- Ashlar
- Finely dressed stone laid in regular courses.
- Rubble walling
- Rough stone walling.
- Banker mason
- A mason who cuts and carves stone in a workshop.
- Indent
- A piece of new stone let into an existing wall.
- Lime mortar
- A breathable mortar for historic masonry.
- Repointing
- Replacing the mortar in the joints.
AFTER
When the job is done
Hiring a stonemason: questions people ask
No licence or register applies anywhere in the UK.
Like-for-like repair generally does not; structural alterations do.
£220–£450 a day, typically around £320. Carving, lime work on old buildings and location raise the day rate. The full figures sit in the Stonemason price guide; the postcode search above lists stonemasons close to you with their prices.
It lets old stone breathe; hard cement can trap moisture and damage the stone.
For high work, usually; HSE treats ladders as suitable only for short, low-risk tasks.
Check with the council before altering it; listed status is a separate consent from building regulations.
MORE GUIDES
More hiring guides in trades & construction
Stonemasons near you
Sources — checked October 2026
- gov.uk — building regulations approval (England)
- gov.uk — building regulations: how to apply
- mygov.scot — if a builder is doing the work for you
- nidirect — how to apply for Building Regulations approval
- HSE — work at height myths (ladders and the 30-minute guide)
- Consumer Rights Act 2015, section 49 — reasonable care and skill
- Consumer Rights Act 2015, section 54 — what you can ask for when a service falls short
- Consumer Contracts Regulations 2013, regulation 30 — the 14-day cancellation period
- Consumer Contracts Regulations 2013, regulation 28 — contracts the cancellation right does not cover
- Consumer Contracts Regulations 2013, regulation 36 — services started within the cancellation period
- Civil Procedure Rules Part 26 — the small claims track limit (England and Wales)
- Scottish Courts and Tribunals — making a claim under simple procedure
- nidirect — the small claims process (Northern Ireland)
- Buildings and construction (VAT Notice 708) — 2.1 Construction services: work to an existing building is normally standard-rated
- GOV.UK — VAT rates
- GOV.UK — Register for VAT: when to register
