How to hire an orangery builder in the UK
The checks, the questions and the paperwork.
Whether an orangery needs approval depends on its design — ask building control. The checks, the lantern and foundation questions, and the paperwork.
- Search and compare — no account needed
- Nearest to you first
- One score from Google, Trustpilot and Locufy reviews
THE 60-SECOND VERSION
Hiring an orangery builder in five steps
- Ask building control firstYour orangery's design decides whether it needs approval.
- Get drawings and structureFoundations, piers, roof beams and the lantern specified.
- Check planningA separate question from building regulations.
- Agree the doors to the houseBifolds or an open plan affect approval and heat.
- Keep the certificatesCompletion certificate if approved, glazing and electrical certificates.
BEFORE YOU BOOK
Check before you book
No register applies
No law licenses orangery builders in England, Wales, Scotland or Northern Ireland; for the orangery build the law controls the work itself, through building regulations approval where it is needed. A trader quoting for the orangery build should have public liability insurance and tell you who provides it. That trader status is what gives you rights under the Consumer Rights Act 2015, and for a home or online booking a 14-day cancellation window under the Consumer Contracts Regulations 2013 — which does not cover goods made to your specification, and leaves you paying for work you asked to start early.
Find out early whether the orangery build needs approval or a warrant, and whose name is on the application. See the insurance certificate before you confirm the orangery build; the Locufy profile shows the trader and ID-checked badges. gov.uk →
Building regulations approval
Whether the orangery build needs building regulations approval depends on its design, the roof and how it connects to the house; building control will say which applies to yours. Under a full plans application in England, building control should issue the completion certificate for the orangery build within 8 weeks of the work ending, if it meets the regulations.
Get the building control reference for the orangery build before anything starts. gov.uk →
Party wall notice
If the orangery build touches a shared wall or is close to the boundary in England or Wales, the Party Wall etc. Act 1996 means notifying the neighbours first; this is separate from building regulations, and Scotland follows other rules.
Find out who is handling party wall notice for the orangery build and the timing. gov.uk →
Building warrant (Scotland)
If you live in Scotland and the orangery build needs a warrant, getting it is your job as owner — the council can fine you and have unwarranted work removed. In Northern Ireland, notify the council's building control ahead of the orangery build.
In Scotland, see the warrant before the orangery build begins; in Northern Ireland, ask for the building control reference. mygov.scot →
VAT
HMRC puts building an orangery onto a home at the standard rate of 20%; once a trader's taxable turnover passes £90,000 it must register, charge the 20% and list it apart from the price of the work.
Ask for the VAT number, and look for VAT as its own line on the orangery contract. gov.uk →
A good answer: A clear answer after checking the design with building control.
A good answer: Depth and type, designed for the ground and the roof load.
A good answer: Product named, with the roof build-up and insulation.
A good answer: Radiators or underfloor heating, and who fits them.
A good answer: An electrician who certifies the work, notifiable if a new circuit.
A good answer: Base, structure, roof, glazing and finishes, with dates.
Getting the quote right
- Drawings and structural design referenced
- Foundations, piers and dwarf walls
- Roof, lantern and glazing named
- Heating, electrics and flooring
- Who actually attends — the builders and the glazing fitters, employed or subcontracted — and the business's VAT number, with VAT at 20% shown as its own line
- Stage payments
Walk away if
- Says no orangery ever needs approval
- No structural detail for the roof
- Large deposit for a made-to-measure lantern with no terms
- No programme
- Electrics with no certificate
What an orangery builder costs: £20,000–£55,000 per project
Orangeries are quoted per project; size, the lantern and glazing, the piers and doors, and heating set the figure. Orangery Builder price guide →
Guide prices compiled by the Locufy team from published Irish and UK provider price lists and 2026/27 cost guides. Updated 2026.
KNOW WHAT TO LOOK FOR? NOW FIND ONE
Orangery builders near you, with the badges that matter shown
ID checked, trader status and one score from every review — on the card, before you message anyone. Nearest first. No account needed to look.
Or post the job free and let them come to you.
- Design and approvalsDrawings, structural design, building control and planning.
- GroundworksFoundations dug and inspected.
- StructurePiers, dwarf walls, roof beams.
- Roof and glazingLantern, roof covering and glazed units.
- Fit-out and completionHeating, electrics, floor, final checks.
- Roof lantern
- A raised glazed structure in a flat roof.
- Pier
- A brick column between glazed sections.
- Bifold doors
- Folding glazed doors that open wide.
- Perimeter roof
- The solid flat roof around the lantern.
- Thermal separation
- Doors or a wall between the orangery and the house.
- Completion certificate
- Building control's confirmation that the work complies.
AFTER
When the job is done
Hiring an orangery builder: questions people ask
It depends on the design and how it connects to the house; ask building control. Building control will confirm which rules apply.
No law licenses them; check approval, structural design, insurance and finished examples.
£20,000–£55,000 a project, typically around £32,500. Size, the lantern and glazing, the piers and bifold doors drive it. For what is usually included, read the Orangery Builder price guide; enter a postcode above to compare orangery builders locally.
Possibly; planning permission and building regulations approval are separate.
In England and Wales, under the Party Wall etc. Act 1996 if work is on or near a shared boundary wall.
Goods made to your specification fall outside the usual 14-day cancellation right; check the contract terms.
MORE GUIDES
More hiring guides in trades & construction
Orangery builders near you
Sources — checked October 2026
- gov.uk — building regulations approval (England)
- gov.uk — building regulations: how to apply
- TrustMark — the Government Endorsed Quality Scheme
- mygov.scot — if a builder is doing the work for you
- nidirect — how to apply for Building Regulations approval
- gov.uk — party walls and building work
- Party Wall etc. Act 1996
- HSE — CDM 2015: domestic clients
- HSE — deciding if asbestos work must be done by a licensed contractor
- Consumer Rights Act 2015, section 49 — reasonable care and skill
- Consumer Rights Act 2015, section 54 — what you can ask for when a service falls short
- Consumer Contracts Regulations 2013, regulation 30 — the 14-day cancellation period
- Consumer Contracts Regulations 2013, regulation 28 — contracts the cancellation right does not cover
- Consumer Contracts Regulations 2013, regulation 36 — services started within the cancellation period
- Civil Procedure Rules Part 26 — the small claims track limit (England and Wales)
- Scottish Courts and Tribunals — making a claim under simple procedure
- nidirect — the small claims process (Northern Ireland)
- Buildings and construction (VAT Notice 708) — 2.1 Construction services: work to an existing building is normally standard-rated
- GOV.UK — VAT rates
- GOV.UK — Register for VAT: when to register