HOW TO HIRE · ELECTRICAL

How to hire a generator installer in Ireland
The checks, the questions and the paperwork.

A generator installation in Ireland costs €800–€5,000 per install, typically around €2,000. Here is how to check that in a minute, what to ask before you book, and what you must be handed when the job is done.

  • Search and compare — no account needed
  • Nearest to you first
  • One score from Google, Trustpilot and Locufy reviews

THE 60-SECOND VERSION

Hiring a generator installer in five steps

  1. Are you on the Safe Electric register, and what is your number?A number you can look up yourself before you agree a price — fuel Supply Setup — for generators that require fuel, the installation will include setting up a safe and compliant fuel supply system.
  2. Will I get completion Certificate, and when?On the day the work is finished and tested, not posted on later — electrical Connection — the installation includes connecting the generator to the home’s electrical system.
  3. How does size of the generator change the price?The extra square metres are where most of the cost sits. — ask before the quote rather than after.
  4. How does complexity of the installation change the price?Complicated work is priced with room for the unexpected. — ask before the quote rather than after.
  5. How does any additional electrical work required change the price?The quote moves with this more than with anything else listed. — ask before the quote rather than after.

BEFORE YOU BOOK

Check before you book

Safe Electric

Restricted to Registered Electrical Contractor (REC): a new circuit; a rewire; a new or replacement distribution board; work at the meter; a new supply to a bathroom or an outdoor area. Not restricted: replacing a light fitting like for like; replacing a socket front like for like.

Search the Safe Electric register for the name or the registration number before you agree a price. safeelectric.ie →

Completion Certificate

Issued by the Registered Electrical Contractor on completion of restricted works, once tested. It matters because it records that the work met the national wiring rules and was tested, and it is asked for on sale, remortgage and insurance.

Agree before the work starts that you will be handed completion certificate, and keep it with the house papers.

Insurance

Expect public liability; ask who the insurer is and for the policy number. From a company, ask for the insurer, the limit and the VAT number, and ask who actually attends: the team that turns up may be employed, subcontracted or both, and only one of those is supervised by the firm you are paying.

Ask to see the current certificate of insurance — the insurer's name, the limit and the date it runs to.

Trader or private seller

Under the Consumer Rights Act 2022 a trader must tell you they are a trader, and your consumer rights — work carried out with reasonable skill and care, and a cooling-off period on a contract agreed in your home or online — apply to traders and not to private sellers. On Locufy the trader status is shown on the profile.

Look for the trader badge on the Locufy profile, and ask anyone else for it in writing before you agree a price.

VAT

VAT at 13.5%, the reduced rate Revenue publishes for this service. Ask whether the price you were given includes it. A trader under the €42,500 registration threshold does not charge it; one over it must, and must show it separately.

Ask whether the figure you were given includes it, and for the VAT number if they are registered — Revenue publishes the rate for this service. revenue.ie →

“Are you on the Safe Electric register, and what is your number?”

A good answer: A number you can look up yourself before you agree a price — fuel Supply Setup — for generators that require fuel, the installation will include setting up a safe and compliant fuel supply system.

“Will I get completion Certificate, and when?”

A good answer: On the day the work is finished and tested, not posted on later — electrical Connection — the installation includes connecting the generator to the home’s electrical system.

“How does size of the generator change the price?”

A good answer: The extra square metres are where most of the cost sits. — ask before the quote rather than after.

“How does complexity of the installation change the price?”

A good answer: Complicated work is priced with room for the unexpected. — ask before the quote rather than after.

“How does any additional electrical work required change the price?”

A good answer: The quote moves with this more than with anything else listed. — ask before the quote rather than after.

“What is not included?”

A good answer: Assessment and Planning — A thorough site assessment is conducted to determine the best location for the generator installation — get the exclusions named in the quote, because a generator installer job is priced on what was agreed and not on what was assumed.

“Who insures you, and what is the policy number?”

A good answer: Expect public liability; ask who the insurer is and for the policy number — fuel Supply Setup — this involves installing the necessary fuel supply system for generators, whether it be natural gas, propane, or diesel.

Getting the quote right

  • Size of the generator — the extra square metres are where most of the cost sits.
  • Complexity of the installation — complicated work is priced with room for the unexpected.
  • Any additional electrical work required — the quote moves with this more than with anything else listed.
  • Assessment and Planning — it is one of the first things you will be asked about.
  • In writing before anyone starts — a message on Locufy counts
  • What is NOT included, named
  • Who actually attends, and whether they are employed or subcontracted
  • The VAT number, and whether it checks out on the Revenue register

Walk away if

  • They are not on the Safe Electric register, or the number does not resolve to the name on the quote
  • No Completion Certificate is offered, or you are told you do not need one for work of this kind
  • They will not talk about it: size of the generator — the extra square metres are where most of the cost sits
  • They will not talk about it: complexity of the installation — complicated work is priced with room for the unexpected
  • They will not talk about it: any additional electrical work required — the quote moves with this more than with anything else listed
  • A price for the generator installer before anyone has asked the size, the access or the condition of what they are working on
LOW
€800
TYPICAL
€2,000
HIGH
€5,000

What a generator installer costs: €800–€5,000 per install

The figures are for the job, per install, and a quote for your own is the only number that binds anyone. Portable generator installation and Standby generator installation each carry their own band. Generator Installation price guide →

Guide prices compiled by the Locufy team from published Irish and UK provider price lists and 2026/27 cost guides. Updated 2026.

KNOW WHAT TO LOOK FOR? NOW FIND ONE

Generator installers near you, with the badges that matter shown

ID checked, trader status and one score from every review — on the card, before you message anyone. Nearest first. No account needed to look.

Or post the job free and let them come to you.

  1. Look firstSize of the generator — the extra square metres are where most of the cost sits — that is what the generator installer is judging on the first visit, and a price given without it is a guess.
  2. Agree what is being doneComplexity of the installation — complicated work is priced with room for the unexpected — put in writing before anyone starts, because it is the document you both read back at the end.
  3. The work itselfAny additional electrical work required — the quote moves with this more than with anything else listed — and anything found on the day that was not in that is priced before it is started.
  4. Check it togetherAssessment and Planning — it is one of the first things you will be asked about — walked against the written scope rather than against the feeling of it, while the generator installer is still there.
  5. What you are handedCompletion Certificate, the invoice and any guarantee on the workmanship and the parts, check for compliance with local regulations and safety standards during installation.

Assessment and Planning
A thorough site assessment is conducted to determine the best location for the generator installation.
Electrical Connection
The installation includes connecting the generator to the home’s electrical system.
Fuel Supply Setup
For generators that require fuel, the installation will include setting up a safe and compliant fuel supply system.
Standby Generator Installation
This job includes installing a permanently mounted generator that automatically activates during a power failure.
Completion Certificate
The document the Registered Electrical Contractor issues on completion of restricted works, once tested; it matters because it records that the work met the national wiring rules and was tested, and it is asked for on sale, remortgage and insurance.
Safe Electric
The Safe Electric register — the list you can search before you book, and the thing a generator installer either is on or is not.

AFTER

When the job is done

Keep Completion CertificateCompletion Certificate is issued by the trader, not asked for later — fuel Supply Setup — for generators that require fuel, the installation will include setting up a safe and compliant fuel supply system, because it is what a buyer's solicitor, an insurer or a lender asks for long after the generator installer has gone.
Test what was doneElectrical Connection — the installation includes connecting the generator to the home’s electrical system — and something that does not work on the day is theirs to put right there and then.
Ask what the guarantee isOn the workmanship and on the parts, and for how long each one runs — they are usually different. assessment and Planning — A thorough site assessment is conducted to determine the best location for the generator installation — under the Consumer Rights Act 2022 what was agreed is what can be relied on.
Leave the reviewOnly a booked job can be reviewed on Locufy, which is why the score on a generator installer's card means something — fuel Supply Setup — this involves installing the necessary fuel supply system for generators, whether it be natural gas, propane, or diesel.

MONEY BACK

Grants that may apply

Two public schemes touch electrical work in a home. Neither pays for the job itself; both are claimed for the equipment and its installation, and the amounts and the dates are SEAI's own.

SEAI · GRANTVerified October 2026

EV Home Charger Grant

Up to €300100% of the installation cost to a maximum of €300, covering the charger and the work.

Who: A homeowner, or anyone with off-street parking at the property. You do not have to own an electric vehicle to apply.

  • The charger must be a smart charger on SEAI's Smart Charger Register.
  • The grant is claimed for the charger and its installation together, not for the unit alone.
Official details on seai.ie →
SEAI · GRANTVerified October 2026

Solar Electricity (PV) Grant

Up to €1,800€700 per kWp to 2 kWp, then €200 for each additional kWp to 4 kWp, capped at €1,800.

Who: The owner of a home built and occupied before 2025.

  • From 6 October 2026 a further €600 towards battery storage is added to the solar grant.
  • From 6 October 2026 the eligibility date moved to homes built and occupied before 2025.
Official details on seai.ie →

Schemes change. The amounts above were checked on the dates shown; the official page is the one that counts.

STEP 1Say it in writing, firstSay what is wrong and what you want done. Under the Consumer Rights Act 2022 the work must be carried out with reasonable skill and care, and defective work put right.
STEP 2Use the make-it-right step on LocufyUnder four stars you are asked whether to send it to the provider first; we follow it through. Then review.
STEP 3Escalate to the body that regulates itReport it to Safe Electric.
STEP 4Small claimsSmall claims covers €2,000, once you have asked in writing and given them a chance to put it right.

Hiring a generator installer: questions people ask

The cost is influenced by several factors, including the type and size of the generator, the complexity of the installation, and any additional electrical work required. Local regulations and site conditions can also affect the final price.

The duration of a generator installation can vary, but most jobs take between 4 to 8 hours. This timeframe can extend if additional electrical work or site preparation is needed.

Same-day installation may be possible, but it depends on the availability of the installer and the specific generator model. It is advisable to check with local services to confirm their availability for urgent requests.

Yes, booking multiple jobs such as generator installation along with electrical upgrades or maintenance can often lead to cost savings. Many service providers offer discounts for bundled services.

Out of scope items can include extensive site preparation, landscaping adjustments, or structural modifications to accommodate the generator. It's important to clarify these details with the installer before starting the project.

Search the name or the registration number. If the number does not resolve to the name on the quote, stop there.