HOW TO HIRE · HOME REPAIRS & HANDYMAN

How to hire a joiner in Ireland
The checks, the questions and the paperwork.

A door hanging & repair in Ireland costs €100–€300 per door, typically around €160. Here is how to check that in a minute, what to ask before you book, and what you must be handed when the job is done.

  • Search and compare — no account needed
  • Nearest to you first
  • One score from Google, Trustpilot and Locufy reviews

TWO WAYS TO BUY THIS

Which do you need?

An individual, by the hour

You book a person for a set number of hours and they do what you ask. There is no scope and no quote: you are buying time. Best where the work is routine, you can say what you want done, and you would rather pay for two hours than for a job.

A company, for the job

You describe the job and they price it. There is a scope, a written quote, a team and somebody supervising it. Best where the work is one big push, where it needs equipment, or where you want one party answerable for the result.

What changes between them

The rate per hour against a price for the job; one person against a team; your own instructions against a written scope; and VAT, which an individual under the registration threshold does not charge at all.

THE 60-SECOND VERSION

Hiring a joiner in five steps

  1. Are you on the Construction Industry Register Ireland, and what is your number?A number you can look up yourself before you agree a price — lock Installation and Repair — lock installation and repair are crucial for maintaining door security.
  2. Will I get a Certificate of Compliance on Completion, and when?On the day the work is finished and tested, not posted on later — frame Repair — damaged door frames can lead to significant issues with door functionality.
  3. How does condition of the door change the price?The state it is in decides how much has to come off first. — ask before the quote rather than after.
  4. How does materials used change the price?The parts and products used are added to the bill. — ask before the quote rather than after.
  5. How does complexity of the installation or repair change the price?The state it is in decides how much has to come off first. — ask before the quote rather than after.

BEFORE YOU BOOK

Check before you book

By the hour

Construction Industry Register Ireland (CIRI)

CIRI is a VOLUNTARY register today. The Regulation of Providers of Building Works and Miscellaneous Provisions Act 2022 was signed on 5 July 2022 and S.I. 429/2022 commenced parts of it on 29 August 2022; the Construction Industry Federation was appointed registration body on 16 January 2023. Registration is NOT yet mandatory: the divisions regulations had not been drafted as of a May 2025 Dáil answer, and CIRI itself projects mandatory registration from 2027. So being absent from CIRI breaks no law in 2026 — and being on it is still the only independent check of a builder that exists here.

Search the Construction Industry Register Ireland for the name or the registration number before you agree a price. ciri.ie →

a Certificate of Compliance on Completion

Issued by the assigned certifier and the builder, where the work needed a commencement notice on completion, before the building is occupied. It matters because it is lodged on the statutory register and is what a buyer's solicitor looks for; work done without one surfaces on sale.

Agree before the work starts that you will be handed a certificate of compliance on completion, and keep it with the house papers.

Trader or private seller

Under the Consumer Rights Act 2022 a trader must tell you they are a trader, and your consumer rights — work carried out with reasonable skill and care, and a cooling-off period on a contract agreed in your home or online — apply to traders and not to private sellers. On Locufy the trader status is shown on the profile.

Look for the trader badge on the Locufy profile, and ask anyone else for it in writing before you agree a price.

VAT

VAT at 13.5%, the reduced rate Revenue publishes for this service. Ask whether the price you were given includes it. A trader under the €42,500 registration threshold does not charge it; one over it must, and must show it separately.

Ask whether the figure you were given includes it, and for the VAT number if they are registered — Revenue publishes the rate for this service. revenue.ie →

Insurance

Expect public liability and, for anything structural, professional indemnity from whoever designed it. You are booking an individual for a set number of hours, so ask whether the ID has been checked and what the rating is from people who booked the same way — there is no company behind them to carry either.

A company

Construction Industry Register Ireland (CIRI)

CIRI is a VOLUNTARY register today. The Regulation of Providers of Building Works and Miscellaneous Provisions Act 2022 was signed on 5 July 2022 and S.I. 429/2022 commenced parts of it on 29 August 2022; the Construction Industry Federation was appointed registration body on 16 January 2023. Registration is NOT yet mandatory: the divisions regulations had not been drafted as of a May 2025 Dáil answer, and CIRI itself projects mandatory registration from 2027. So being absent from CIRI breaks no law in 2026 — and being on it is still the only independent check of a builder that exists here.

Search the Construction Industry Register Ireland for the name or the registration number before you agree a price. ciri.ie →

a Certificate of Compliance on Completion

Issued by the assigned certifier and the builder, where the work needed a commencement notice on completion, before the building is occupied. It matters because it is lodged on the statutory register and is what a buyer's solicitor looks for; work done without one surfaces on sale.

Agree before the work starts that you will be handed a certificate of compliance on completion, and keep it with the house papers.

Trader or private seller

Under the Consumer Rights Act 2022 a trader must tell you they are a trader, and your consumer rights — work carried out with reasonable skill and care, and a cooling-off period on a contract agreed in your home or online — apply to traders and not to private sellers. On Locufy the trader status is shown on the profile.

Look for the trader badge on the Locufy profile, and ask anyone else for it in writing before you agree a price.

VAT

VAT at 13.5%, the reduced rate Revenue publishes for this service. Ask whether the price you were given includes it. A trader under the €42,500 registration threshold does not charge it; one over it must, and must show it separately.

Ask whether the figure you were given includes it, and for the VAT number if they are registered — Revenue publishes the rate for this service. revenue.ie →

Insurance

Expect public liability and, for anything structural, professional indemnity from whoever designed it. From a company, ask for the insurer, the limit and the VAT number, and ask who actually attends: the team that turns up may be employed, subcontracted or both, and only one of those is supervised by the firm you are paying.

“Are you on the Construction Industry Register Ireland, and what is your number?”

A good answer: A number you can look up yourself before you agree a price — lock Installation and Repair — lock installation and repair are crucial for maintaining door security.

“Will I get a Certificate of Compliance on Completion, and when?”

A good answer: On the day the work is finished and tested, not posted on later — frame Repair — damaged door frames can lead to significant issues with door functionality.

“How does condition of the door change the price?”

A good answer: The state it is in decides how much has to come off first. — ask before the quote rather than after.

“How does materials used change the price?”

A good answer: The parts and products used are added to the bill. — ask before the quote rather than after.

“How does complexity of the installation or repair change the price?”

A good answer: The state it is in decides how much has to come off first. — ask before the quote rather than after.

“What is not included?”

A good answer: Hinge Replacement — hinge replacement is essential when existing hinges are worn or damaged, causing doors to sag or not close properly — get the exclusions named in the quote, because a joiner job is priced on what was agreed and not on what was assumed.

“Who insures you, and what is the policy number?”

A good answer: Expect public liability and, for anything structural, professional indemnity from whoever designed it — door Installation — this includes the hanging of new doors, whether they are interior or exterior.

Getting the quote right, or booking by the hour

By the hour

  • The rate per hour, and whether it changes in the evening or at a weekend
  • The minimum booking, and what happens if the job finishes early
  • What they bring and what you supply
  • Whether the ID has been checked, and the rating from people who booked the same way
  • Insurance, where the work can damage something or somebody
  • The hours and the list of what is to be done, agreed before the first one
  • Condition of the door — the state it is in decides how much has to come off first.
  • Materials used — the parts and products used are added to the bill.
  • Complexity of the installation or repair — the state it is in decides how much has to come off first.
  • Access issues — difficult reach means more setting up and taking down.
  • In writing before anyone starts — a message on Locufy counts
  • What is NOT included, named

A company

  • Condition of the door — the state it is in decides how much has to come off first.
  • Materials used — the parts and products used are added to the bill.
  • Complexity of the installation or repair — the state it is in decides how much has to come off first.
  • Access issues — difficult reach means more setting up and taking down.
  • In writing before anyone starts — a message on Locufy counts
  • What is NOT included, named
  • Who actually attends, and whether they are employed or subcontracted
  • The VAT number, and whether it checks out on the Revenue register

Walk away if

  • They are not on the Construction Industry Register Ireland, or the number does not resolve to the name on the quote
  • No a Certificate of Compliance on Completion is offered, or you are told you do not need one for work of this kind
  • They will not talk about it: condition of the door — the state it is in decides how much has to come off first
  • They will not talk about it: materials used — the parts and products used are added to the bill
  • They will not talk about it: complexity of the installation or repair — the state it is in decides how much has to come off first
  • A price for the joiner before anyone has asked the size, the access or the condition of what they are working on
LOW
€100
TYPICAL
€160
HIGH
€300

What a joiner costs: €100–€300 per door

The figures are for the job, per door, and a quote for your own is the only number that binds anyone. New door installation and Door frame repair each carry their own band. Door Hanging & Repair price guide →

Guide prices compiled by the Locufy team from published Irish and UK provider price lists and 2026/27 cost guides. Updated 2026.

KNOW WHAT TO LOOK FOR? NOW FIND ONE

Joiners near you, with the badges that matter shown

ID checked, trader status and one score from every review — on the card, before you message anyone. Nearest first. No account needed to look.

Or post the job free and let them come to you.

  1. Look firstCondition of the door — the state it is in decides how much has to come off first — that is what the joiner is judging on the first visit, and a price given without it is a guess.
  2. Agree what is being doneMaterials used — the parts and products used are added to the bill — put in writing before anyone starts, because it is the document you both read back at the end.
  3. The work itselfComplexity of the installation or repair — the state it is in decides how much has to come off first — and anything found on the day that was not in that is priced before it is started.
  4. Check it togetherAccess issues — difficult reach means more setting up and taking down — walked against the written scope rather than against the feeling of it, while the joiner is still there.
  5. What you are handedA Certificate of Compliance on Completion, the invoice and any guarantee on the workmanship and the parts, surrounding space — the work cannot be scheduled until this is known.

Door Installation
This includes the hanging of new doors, whether they are interior or exterior.
Hinge Replacement
Hinge replacement is essential when existing hinges are worn or damaged, causing doors to sag or not close properly.
Frame Repair
Damaged door frames can lead to significant issues with door functionality.
Lock Installation and Repair
Lock installation and repair are crucial for maintaining door security.
Weatherstripping Installation
Adding weatherstripping to doors to improve energy efficiency and reduce drafts.
Door Alignment Adjustment
Adjusting the hinges and frame to correct misaligned doors that may stick or not close properly.

AFTER

When the job is done

Keep a Certificate of Compliance on CompletionA Certificate of Compliance on Completion is issued by the trader, not asked for later — lock Installation and Repair — lock installation and repair are crucial for maintaining door security, because it is what a buyer's solicitor, an insurer or a lender asks for long after the joiner has gone.
Test what was doneFrame Repair — damaged door frames can lead to significant issues with door functionality — and something that does not work on the day is theirs to put right there and then.
Ask what the guarantee isOn the workmanship and on the parts, and for how long each one runs — they are usually different. hinge Replacement — hinge replacement is essential when existing hinges are worn or damaged, causing doors to sag or not close properly — under the Consumer Rights Act 2022 what was agreed is what can be relied on.
Leave the reviewOnly a booked job can be reviewed on Locufy, which is why the score on a joiner's card means something — door Installation — this includes the hanging of new doors, whether they are interior or exterior.

STEP 1Say it in writing, firstSay what is wrong and what you want done. Under the Consumer Rights Act 2022 the work must be carried out with reasonable skill and care, and defective work put right.
STEP 2Use the make-it-right step on LocufyUnder four stars you are asked whether to send it to the provider first; we follow it through. Then review.
STEP 3Escalate to the body that regulates itReport it to Construction Industry Register Ireland (CIRI).
STEP 4Small claimsSmall claims covers €2,000, once you have asked in writing and given them a chance to put it right.

Hiring a joiner: questions people ask

Several factors can affect the overall cost, including the type of door, the condition of the door frame, and whether any additional repairs are needed. The location and experience level of the tradesperson can also play a role in pricing.

Most door hanging and repair jobs can be completed within 1 to 3 hours, depending on the complexity of the work involved. Factors such as the condition of the existing door and frame can extend the time required.

In most cases, a general handyman can handle door hanging and repair tasks. However, if there are structural issues or if the work involves electrical or gas components, it is advisable to consult a qualified specialist.

Many tradespeople offer emergency or same-day services for door hanging and repair, but availability can vary. It's best to contact local professionals directly to inquire about their emergency service options.

Yes, booking multiple related jobs at the same time can often lead to cost savings, as tradespeople may offer discounts for larger projects. It's a good idea to discuss this with the professional when requesting a quote.

Search the name or the registration number. If the number does not resolve to the name on the quote, stop there.