HOW TO HIRE · TRADES & CONSTRUCTION

How to hire a renderer in Ireland
The checks, the questions and the paperwork.

A rendering in Ireland costs €80–€120 per m², typically around €100. Here is how to check that in a minute, what to ask before you book, and what you must be handed when the job is done.

  • Search and compare — no account needed
  • Nearest to you first
  • One score from Google, Trustpilot and Locufy reviews

THE 60-SECOND VERSION

Hiring a renderer in five steps

  1. Are you on the Construction Industry Register Ireland, and what is your number?A number you can look up yourself before you agree a price — maintenance and Repair — rendering may also include maintenance and repair services for existing walls, such as patching cracks or repainting.
  2. Will I get a Certificate of Compliance on Completion, and when?On the day the work is finished and tested, not posted on later — finishing Techniques — finishing techniques can vary, including textured finishes, smooth trowel finishes, or even decorative patterns.
  3. How does type of materials used change the price?The parts and products used are added to the bill. — ask before the quote rather than after.
  4. How does complexity of the finish change the price?It decides how much of the job can be done at once. — ask before the quote rather than after.
  5. How does condition of the walls change the price?The state it is in decides how much has to come off first. — ask before the quote rather than after.

BEFORE YOU BOOK

Check before you book

Construction Industry Register Ireland (CIRI)

CIRI is a VOLUNTARY register today. The Regulation of Providers of Building Works and Miscellaneous Provisions Act 2022 was signed on 5 July 2022 and S.I. 429/2022 commenced parts of it on 29 August 2022; the Construction Industry Federation was appointed registration body on 16 January 2023. Registration is NOT yet mandatory: the divisions regulations had not been drafted as of a May 2025 Dáil answer, and CIRI itself projects mandatory registration from 2027. So being absent from CIRI breaks no law in 2026 — and being on it is still the only independent check of a builder that exists here.

Search the Construction Industry Register Ireland for the name or the registration number before you agree a price. ciri.ie →

a Certificate of Compliance on Completion

Issued by the assigned certifier and the builder, where the work needed a commencement notice on completion, before the building is occupied. It matters because it is lodged on the statutory register and is what a buyer's solicitor looks for; work done without one surfaces on sale.

Agree before the work starts that you will be handed a certificate of compliance on completion, and keep it with the house papers.

Insurance

Expect public liability and, for anything structural, professional indemnity from whoever designed it. From a company, ask for the insurer, the limit and the VAT number, and ask who actually attends: the team that turns up may be employed, subcontracted or both, and only one of those is supervised by the firm you are paying.

Ask to see the current certificate of insurance — the insurer's name, the limit and the date it runs to.

Trader or private seller

Under the Consumer Rights Act 2022 a trader must tell you they are a trader, and your consumer rights — work carried out with reasonable skill and care, and a cooling-off period on a contract agreed in your home or online — apply to traders and not to private sellers. On Locufy the trader status is shown on the profile.

Look for the trader badge on the Locufy profile, and ask anyone else for it in writing before you agree a price.

VAT

VAT at 13.5%, the reduced rate Revenue publishes for this service. Ask whether the price you were given includes it. A trader under the €42,500 registration threshold does not charge it; one over it must, and must show it separately.

Ask whether the figure you were given includes it, and for the VAT number if they are registered — Revenue publishes the rate for this service. revenue.ie →

“Are you on the Construction Industry Register Ireland, and what is your number?”

A good answer: A number you can look up yourself before you agree a price — maintenance and Repair — rendering may also include maintenance and repair services for existing walls, such as patching cracks or repainting.

“Will I get a Certificate of Compliance on Completion, and when?”

A good answer: On the day the work is finished and tested, not posted on later — finishing Techniques — finishing techniques can vary, including textured finishes, smooth trowel finishes, or even decorative patterns.

“How does type of materials used change the price?”

A good answer: The parts and products used are added to the bill. — ask before the quote rather than after.

“How does complexity of the finish change the price?”

A good answer: It decides how much of the job can be done at once. — ask before the quote rather than after.

“How does condition of the walls change the price?”

A good answer: The state it is in decides how much has to come off first. — ask before the quote rather than after.

“What is not included?”

A good answer: Surface Preparation — before rendering, surfaces must be properly prepared, which may involve cleaning, repairing, or applying a bonding agent — get the exclusions named in the quote, because a renderer job is priced on what was agreed and not on what was assumed.

“Who insures you, and what is the policy number?”

A good answer: Expect public liability and, for anything structural, professional indemnity from whoever designed it — types of Rendering — rendering can include various materials such as cement, acrylic, or lime-based products.

Getting the quote right

  • Type of materials used — the parts and products used are added to the bill.
  • Complexity of the finish — it decides how much of the job can be done at once.
  • Condition of the walls — the state it is in decides how much has to come off first.
  • Complexity of the job — it is the detail most people forget to mention when asking.
  • In writing before anyone starts — a message on Locufy counts
  • What is NOT included, named
  • Who actually attends, and whether they are employed or subcontracted
  • The VAT number, and whether it checks out on the Revenue register

Walk away if

  • They are not on the Construction Industry Register Ireland, or the number does not resolve to the name on the quote
  • No a Certificate of Compliance on Completion is offered, or you are told you do not need one for work of this kind
  • They will not talk about it: type of materials used — the parts and products used are added to the bill
  • They will not talk about it: complexity of the finish — it decides how much of the job can be done at once
  • They will not talk about it: condition of the walls — the state it is in decides how much has to come off first
  • A price for the renderer before anyone has asked the size, the access or the condition of what they are working on
LOW
€80
TYPICAL
€100
HIGH
€120

What a renderer costs: €80–€120 per m²

The figures are for the job, per m², and a quote for your own is the only number that binds anyone. External rendering and Internal rendering each carry their own band. Rendering price guide →

Guide prices compiled by the Locufy team from published Irish and UK provider price lists and 2026/27 cost guides. Updated 2026.

KNOW WHAT TO LOOK FOR? NOW FIND ONE

Renderers near you, with the badges that matter shown

ID checked, trader status and one score from every review — on the card, before you message anyone. Nearest first. No account needed to look.

Or post the job free and let them come to you.

  1. Look firstType of materials used — the parts and products used are added to the bill — that is what the renderer is judging on the first visit, and a price given without it is a guess.
  2. Agree what is being doneComplexity of the finish — it decides how much of the job can be done at once — put in writing before anyone starts, because it is the document you both read back at the end.
  3. The work itselfCondition of the walls — the state it is in decides how much has to come off first — and anything found on the day that was not in that is priced before it is started.
  4. Check it togetherComplexity of the job — it is the detail most people forget to mention when asking — walked against the written scope rather than against the feeling of it, while the renderer is still there.
  5. What you are handedA Certificate of Compliance on Completion, the invoice and any guarantee on the workmanship and the parts, access to the property — a locked gate or a shared entrance adds waiting time.

Types of Rendering
Rendering can include various materials such as cement, acrylic, or lime-based products.
Surface Preparation
Before rendering, surfaces must be properly prepared, which may involve cleaning, repairing, or applying a bonding agent.
Finishing Techniques
Finishing techniques can vary, including textured finishes, smooth trowel finishes, or even decorative patterns.
Maintenance and Repair
Rendering may also include maintenance and repair services for existing walls, such as patching cracks or repainting.
External Rendering
This involves applying a render coat to the outside walls of a building for both aesthetic and protective purposes.
Internal Rendering
Used for interior walls, this rendering provides a smooth finish and can help with insulation and soundproofing.

AFTER

When the job is done

Keep a Certificate of Compliance on CompletionA Certificate of Compliance on Completion is issued by the trader, not asked for later — maintenance and Repair — rendering may also include maintenance and repair services for existing walls, such as patching cracks or repainting, because it is what a buyer's solicitor, an insurer or a lender asks for long after the renderer has gone.
Test what was doneFinishing Techniques — finishing techniques can vary, including textured finishes, smooth trowel finishes, or even decorative patterns — and something that does not work on the day is theirs to put right there and then.
Ask what the guarantee isOn the workmanship and on the parts, and for how long each one runs — they are usually different. surface Preparation — before rendering, surfaces must be properly prepared, which may involve cleaning, repairing, or applying a bonding agent — under the Consumer Rights Act 2022 what was agreed is what can be relied on.
Leave the reviewOnly a booked job can be reviewed on Locufy, which is why the score on a renderer's card means something — types of Rendering — rendering can include various materials such as cement, acrylic, or lime-based products.

STEP 1Say it in writing, firstSay what is wrong and what you want done. Under the Consumer Rights Act 2022 the work must be carried out with reasonable skill and care, and defective work put right.
STEP 2Use the make-it-right step on LocufyUnder four stars you are asked whether to send it to the provider first; we follow it through. Then review.
STEP 3Escalate to the body that regulates itReport it to Construction Industry Register Ireland (CIRI).
STEP 4Small claimsSmall claims covers €2,000, once you have asked in writing and given them a chance to put it right.

Hiring a renderer: questions people ask

The cost of rendering can be influenced by factors such as the size of the area to be rendered, the type of materials used, and the complexity of the finish. Additional costs may arise from surface preparation or repairs needed prior to rendering.

The duration of a rendering job can vary based on the project's size and complexity. Generally, small to medium jobs may take a few days, while larger projects can take up to a week or more, especially if multiple layers are applied.

Emergency rendering services may be available, especially for urgent repairs due to weather damage or structural issues. However, availability can vary by provider, so it's best to inquire directly with local professionals.

Yes, many rendering professionals offer package deals for multiple related jobs, such as surface preparation and painting. Combining services can often lead to cost savings and more efficient scheduling.

Out of scope items for rendering services may include structural repairs or extensive wall modifications. Additionally, any electrical or plumbing work must be handled by licensed professionals before rendering can commence.

Search the name or the registration number. If the number does not resolve to the name on the quote, stop there.